CONNECTION MUST BE MADE AT THE
FURNACE VENT EXIT.
VERTICAL VENT SYSTEMS:
1. A gas vent shall terminate above the
2. A type B-1 gas vent shall terminate
at least 5 feet in vertical height
above the highest connected
equipment draft hood or flue collar.
MANUFACTURER’s position now that
new installations of any HTPV pipe
used in a category
product, should cease immediately.
These shall be assembled in
accordance with the manufacturer’s
instructions. See Figure 9.
5. Any angle greater than 45 degrees