English
Nederlands
Fr
ançais
Deut
sch
13
Â
Step 1: Briefly press the set-up button.
•
The yellow LED 601 (LED-D on image page 6) on the EC flashes.
•
You will hear the motor locks open.
•
The green LEDs on the motors flash according to this pattern:
Â
Step 2: Open the vents in the right order of opening priority.
•
At the same time, check that all vents move smoothly.
•
The LED of each motor must flash according to this pattern:
Restart the procedure if not all motor LEDs
respond correctly.
Â
Step 3: Return to the Element Controller and press the SET-UP button.
•
The yellow LED 601 (LED-D on image page 6) lights up solid for 3
seconds and then starts flashing again.
•
After a while the green LED 600 (LED-C on image page 6) lights up.
The EC is ready for calibration.
If the red LED 602 (LED-E on image page 6)
lights up, something has gone wrong. Restart
the procedure by pressing the SET-UP button
for 5 seconds; see step 3.1.3.
Â
Step 4: Check there is no obstacle that could block the windows.
Â
Step 5: Press the operating button for 1 second.
•
The vents open and close automatically at slow speed.
•
The vents then open and close automatically at full speed.
•
While the windows are moving, the green LEDs on the motors flash
according to this pattern:
Summary of Contents for 062.8620
Page 24: ...24 For more information visit http setup ec reynaers com NOTES...
Page 25: ...English Nederlands Fran ais Deutsch 25 NOTES...
Page 44: ...44 Voor meer informatie surf naar http setup ec reynaers com OPMERKINGEN...
Page 45: ...English Nederlands Fran ais Deutsch 45 OPMERKINGEN...
Page 64: ...64 Pour plus d informations consultez http setup ec reynaers com NOTES...
Page 65: ...English Nederlands Fran ais Deutsch 65 NOTES...
Page 84: ...84 F r weitere Informationen besuchen Sie bitte http setup ec reynaers com HINWEISE...
Page 85: ...English Nederlands Fran ais Deutsch 85 HINWEISE...