(g) The protective earth ground wire refers to the wire connection
between the equipment which consumes electric equipment
and the ground wire. The wire diameter of protective earth
ground wire should be at least as above mentioned for each
model and green wire or green wire with yellow ribbon wire is
used.
(h) After having completed the installation, make sure the wiring is
correct.
(i) Please install the leak current protective breaker at the output
power distribution panel of the UPS if necessary.
(j) To connect the load with the UPS, please turn off all the loads
first, then perform the connection and finally turn on the loads
one by one.
(k) No matter the UPS is connected to the utility power or not, the
output of the UPS may have electricity. The parts inside the unit
may still have hazardous voltage after turning off the UPS. To
make the UPS have no output, power off the UPS, and then
disconnect the utility power supply.
(l) Suggest charging the batteries for 8 hours before use. After
connection, turn the input breaker in the “ON” position, the UPS
will charge the batteries automatically. You can also use the
UPS immediately without charging the batteries first, but the
backup time may be less than the standard value.
11
Summary of Contents for RP-UPH104T
Page 1: ...USER S MANUAL On Line 6K 10KVA Uninterruptible Power Supply...
Page 19: ...Battery Status Output Power Temperature History Record 18...
Page 36: ...DB 9 Interface of AS400 communication protocol 35...
Page 39: ...Appendix 1 Outline Description and Back Panel Back view of 6K Back view of 6KL 38...
Page 40: ...Back view of 10K Back view of 10KL 39...
Page 41: ...40...