R11UM0156EJ0240 Rev.2.40
Page 32 of 82
Jul. 28, 2020
PRIME v1.4 Base Node Tool
User Manual
Renesas Electronics Group Confidential
3
.
PC Tool operation procedure
PRELIMINARY
Notice This is not a final specification. Some
parametric limits are Subject to change.
3.6.2.4
AppEmu cycle test procedure
(1) Select SN (i.e. SN #ABCDABCD0002, #ABCDABCD0003 and #ABCDABCD0004).
(2)
Select “AppEmu” connection type.
(3) Select Modulation (for Data-packet) if it needs to be changed fro
m “AUTO”.
(4) Check
“Auto Execute” checkbox in “APPEMU Setting Dialog”.
(5)
Start by “Send” button. (Data is transmitted between the BN and the selected SNs. BN releases
connections after all data transmission finished. BN waits the SNs establish the connection again
and starts data transmission. The results of the test are stored in
“%Y%m%d%H%M%S_prime14_cpx3_pc_bn_appemu.log” Log file.)
(6)
Finish repeating test by “Stop” button.
Figure 3.18 AppEmu data transmission (Cycle test)