18
Certification for Initial Operation
Date 01/2005
Initial Operation
Subsequent Operation
of a REMKO air-conditioning system
The air conditioning system above was put into operation without any objections.
The operator has been trained and the operating instructions distributed.
The unit could not be put into operation for the reasons indicated above.
Company:
Street:
Postal Code, City:
Stamp and signature
Executing company:
Date
Operator
signature
Unit data
Outdoor unit
Indoor unit
Type of unit
Unit number
Refrigerant pipe length/height
———– m/
m
Oil elevation arcs
———– unit
Additional refrigerant amount
g ———–
Condensation pump
———–
Operator / Setup location
Name:
Street:
Postal code, country, city:
Telephone:
Fax:
Test of cooling cycle
Result
Visual check:
Setup of outdoor unit and indoor unit
5
good
4
poor
Heat-exchanger, insulation, pipes
5
good
4
poor
Electrical fuse protection type A
5
good
4
poor
Electrical power/control line (Cu mm²/mm²)
/
5
good
4
poor
Impermeability check:
Vacuum
mbar
5
good
4
poor
Excess pressure
mbar
5
good
4
poor
Add. preparation:
Refrigerant refill amount
g
5
good
4
poor
Shut-off
valves
open
5
good
4
poor
Functional test:
Condensation
flow,
condensation pump(s)
5
good
4
poor
Cooling
mode
5
good
4
poor
Heating
mode
5
good
4
poor
Operational check:
Compressor
mode
5
good
4
poor
Fan mode
5
good
4
poor
Measurement tests:
Room temperature / Air outlet temperature
°C / °C
/
5
good
4
poor
Suction temperature / Overheat °C / K
/
5
good
4
poor
Comments:
Signature of person assembling unit