Green House Manual
Page | 17
10.
You will repeat this process for the opposite side of that same front wall. Your frame should now
look like this.
11.
You will now take your 2 remaining clamps on your inwall pipes to secure your third cross pipe
in between your inwall pipes that will hover over your door.
Third cross pipe over your door