│
8
RTC 6i - www.regulus.eu
3. CONSTRUCTION READINESS & INSTALLATION
The installation may only be carried out by a person with a valid manufacturer‘s authorization. If
any of the subsidy titles are used to acquire a subsidy for the heat pump (e.g. boiler subsidies, or
the New Green Savings program), the installation company must meet the requirements of current
legislation.
3.1. Scope of Supply
-
RTC 6i Heat Pump
-
Installation and Operation Manual
-
2 compensators to protect the plate heat exchanger in the heat pump against frost rupture
3.2. Installation preparation and transport
The installation must be carried out by a qualified person in accordance with the applicable stan
-
dards and all regulations concerning occupational safety must be observed.
-
The heat pump shall be transported and stored in an upright position only.
-
Check that the product has not been damaged in transit. Report immediately any transport
damage to the carrier and supplier.
-
Transport the unit to the installation site before removing the packaging.
-
Move the product with a pallet truck or forklift if possible.
-
It is possible to use lifting straps tied
around the pallet, however only if the
packaging (the wooden frame) had
not been removed.
-
MIND THE DIFFERENT WEIGHT
OF THE RIGHT AND LEFT SIDE OF
THE HEAT PUMP!