86
.............................................
|City Series CV60E-1
installation
86 | City Series CV60E-1
920-163a
22.10.19
6. Place Log 2 on top of the log guide. The pin under Log 2 and the log
guide will act as a guide for Log 2's proper positioning.
7. Install Log 1 to the left of Log 2. Make sure they are connected.
8. Install Log 3 to the right of Log 1. Rest the left side on the log guide.
Connect Log 1 and Log 3 to make the split between less visible.
9. Insert the pin of Log 4 into the hole. The left end of Log 4 should sit
1-1/4" from the edge of the panel, as shown below.
11. Insert the pin of Log 6 into the hole on the right side of the pilot. Posi-
tion the right end of Log 6 2" from the edge of the panel.
12. Insert the pin of Log 7 into the hole on the right-most side. Position
the left end of the log 1-1/8" from edge of panel, as shown below.
3
1
2
1 1/4"
4
10. Insert the pin of Log 5 into the hole on the left side of the pilot. Position
the left end of Log 5 2-1/8" from the edge of the panel.
5
2 1/8"
6
7
1 1/8"
13. Install one box (3.5 lbs) of 3/4" black coal (optional) around the logs
installed on the panels, as shown below.
Correct Black Coal placement
Do not completely cover secondary air inlets-leave them 50% open.
2"
2
CITY SERIES 60