56 | Gi29 Direct Vent Gas Insert
installation
The remote control kit comes with a handheld
transmitter and a remote receiver.
1. Install three AAA alkaline batteries in the
transmitte. Locate the ON/OFF switch located
on the lower left hand side of appliance and
turn switch to ON position - it is now ready for
operation.
Final Check
Before leaving this unit with the customer, the
installer must ensure that the appliance is firing
correctly. This includes:
1. Clocking the appliance to ensure the correct
firing rate (noted on the label) at 15 minutes.
2. If required, adjusting the primary air to ensure
that the flame does not carbon. Allow the unit
to burn for 15 min. to stabilize.
3. Checking for proper draft.
Supplied Remote Control
Use the FPI remote control kit supplied with this
unit. Use of other systems may void your war-
ranty.
Optional Wall Thermostat
A wall thermostat may be installed if desired; follow
the wiring diagram below. FPI offers an optional
programmable thermostat, but any 250-750 millivolt
rated non-anticipator type thermostat that is CSA,
ULC, or UL approved may be used.
Thermostat Wire Table
CA
UTION
Any alteration to the product
that causes sooting or carboning
resulting in damage to the exterior
fascia is not the responsibility of
the manufacturer.
CA
UTION
•
Do not connect the millivolt wall
thermostat wires to the 120 V
wires.
Recommended Maximum Lead Length
(Two-Wire) When Using Wall Thermo
-
stat (CP-2 System)
WIre Size
Max. Length
14 GA.
50 ft.
16 GA.
32 ft.
18 GA.
20 ft.
20 GA.
12 ft.
22 GA.
9 ft.
Summary of Contents for Gi29LE
Page 72: ...72 Gi29 Direct Vent Gas Insert warranty ...
Page 73: ...Gi29 Direct Vent Gas Insert 73 notes ...
Page 74: ...74 Gi29 Direct Vent Gas Insert notes ...
Page 75: ......