Installation
18 — English
Vacuum spray degassing — 03.11.2014
6.1
Installation conditions
6.1.1
Incoming inspection
Prior to shipping, this device was carefully inspected and packed. Damages during transport cannot be excluded.
Proceed as follows:
1. Upon receipt of the goods, check the shipment for
• completeness
and
•
possible transport damage.
2. Document any damage.
3. Contact the forwarding agent to register a complaint accordingly.
6.2
Preparatory work
000037_001_R001
max.45 °C
min.0 °C
≥ DN 15
Preparing the connection of the device to the facility system:
•
Barrier-free access to the facility system.
•
Level and solid placement surface for the device.
• Frost-free,
well-ventilated room.
– Room temperature > 0 - 45 °C.
•
Drain for drain water.
• Filling
connection.
– DN 15 according to DIN 1988 T 4.
• Electric
connection.
– 230 V~, 50 Hz, 16 A with upstream ELCB (tripping current: 0.03 A).