Step 10. Finalising and Handover
Before handing over the system, go through the following items and be sure that they have been
completed.
•
Check screws holding the lid down are in place. Pull on the vents and fans to check that they
are properly attached and will not come loose.
•
If the loads have been hardwired in, check for proper weatherproof seal on the exit gland
from the BlackMax.
•
If the Generator has been hardwired in, check for proper weatherproof seal on the entrance
gland from the BlackMax.
•
Check for proper weatherproof seal on the PV entrance gland from the BlackMax.
•
Check that the system is correctly earthed, either via the customer’s local earth or through a
locally installed earth stake.
•
A MEN link is installed as required.
•
The PV cables have the correct polarity and are correctly connected to the MC4s provided.
•
The battery terminal connections are tight. (check after transportation)
•
Attend to any last-minute commissioning details (See Commissioning in this manual).
•
Explain to the customer how the system operates and how to operate it (see user manual)
•
Provide all Manuals, documents and spare parts to the custome.
•
The system is now ready for Start-up.