INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS
SYDNEY
|
MELBOURNE
|
BRISBANE
|
PERTH
|
AUCKLAND
Australia
1300 788 778 www.rba.com.au
|
New Zealand
0800 722 111 www.rbagroup.co.nz
12
Image 7 – Din Plug Wiring
2.2 Installing The Controller
•
Mount Controller on wall so Piezo wire can easily reach unit.
•
Make electrical connections: Connect Full Flush piezo to
Sensor A.
Connect Half
Flush piezo to
Sensor B.
Connect Solenoid valve to
Valve B.
Connect the Power
Pack to
Power 24V AC
. Settings have been made in house to deliver 6/3L fl ush
volume.
•
Din plug wiring connection has been completed in house to allow for batch test
release. The unit is low voltage 24V AC, so polarity is not important. Just ensure
cable is wired to neutral and active terminals.
INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS
SYDNEY
|
MELBOURNE
|
BRISBANE
|
PERTH
|
AUCKLAND
Australia
1300 788 778 www.rba.com.au
|
New Zealand
0800 722 111 www.rbagroup.co.nz
2.3
Controller settings & runtime
Output B
Output A
0
1.5
0.2
1
1.6
0.3
2
1.7
0.4
3
1.8
0.5
4
1.9
0.6
5
2.0
0.7
6
2.1
0.8
7
2.2
0.9
8
2.3
1.0
9
2.4
1.1
A
2.5
1.2
B
2.6
1.3
C
2.7
1.4
D
2.8
1.5
E
2.9
1.6
F
3.0
1.7
13