INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS
SYDNEY
|
MELBOURNE
|
BRISBANE
|
PERTH
|
AUCKLAND
Australia
1300 788 778 www.rba.com.au
|
New Zealand
0800 722 111 www.rbagroup.co.nz
10
RBA1882-100-008
Nautilus Electronic Piezo Touch Activated Mains Pressure
Dual Flush Valve for WC’s, Incl Flush Indicator Rings, No
Plate
1 x
RBA1882-100
'
Nautilus' Flush Valve Assembly
1 x
RBA8012-999-003
T2 Controller [2019 version] Programmed to suit Nautilus
RBA1882-100
1 x
RBA8010-999-005
24V AC 2AMP Plug Pack Transformer
1 x
RBA8012-999-002 Set Half/Full Flush Indicator Rings Kit
1 x
RBA8010-999-003
SS Piezo no etchings no chamfer
1 x
RBA7125-999-010 Figure 8 Security Cable 0.75mm2
INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS
•
Fit the fl ush valve in the required position maintaining a
minimum 700mm
distance between the outlet of the vacuum breaker and the centre line of the fl ush
pipe connected to the WC pan inlet.
•
Remove face plate from mounting bracket.
•
Install mounting bracket into noggins. Ensure fi xing height allows direct access
to Flush Valve as shown in 4.1.1 above.
•
Piezo buttons have been connected.
•
Make electrical connections: Connect Full Flush piezo to
Sensor A.
Connect Half
Flush piezo to
Sensor B.
Connect Solenoid valve to
Valve B.
Connect the Power
Pack to
Power 24V AC
. Settings have been made in house to deliver 6/3L fl ush
volume.
•
Secure plate to mounting bracket using screws provided.
SYDNEY
|
MELBOURNE
|
BRISBANE
|
PERTH
|
AUCKLAND
Australia
1300 788 778 www.rba.com.au
|
New Zealand
0800 722 111 www.rbagroup.co.nz
15