background image

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

SYDNEY  

|

  MELBOURNE  

|  

BRISBANE  

|  

PERTH  

|  

AUCKLAND

Australia   

1300 788 778   www.rba.com.au   

|   

New Zealand   

0800 722 111  www.rbagroup.co.nz

4

1.1 Hydraulic Requirements

Inlet Connection: 

  

DN 25mm min.

Outlet Connection:  

 

DN 40 to suit DWV

Water Supply Pressure:    

300kPa min – 500kPa max.

Flush Pipe:  

 

 

DN40 (Supplied by others)

Flush Volume:    

 

WELS 3 Star 6/3L or 4 Star 4.5/3L

Electrical: 

 

  24V 

AC

Flow Rate:  

 

 

1.4 LPS

1.2 Electrical Requirements

Solenoid Cable:  

 

2M x 32/0.20ELCF2810 1.00mm2

Piezo Button: 

 

 

Stainless Steel, 3m Cable

Transformer: 

 

 

240VAC/24VAC, 2 AMP incl. 2M cable

Controller: 

 

 

85mm [W] x 65mm [H] x 33mm [D] 

Mains power Supply: 

 

By Others

Warranty: 

  1 

year

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

SYDNEY  

|

  MELBOURNE  

|  

BRISBANE  

|  

PERTH  

|  

AUCKLAND

Australia   

1300 788 778   www.rba.com.au   

|   

New Zealand   

0800 722 111  www.rbagroup.co.nz

4.0 Trouble Shooting 

Problem

Probable Cause

Solution

Piezo button pressed – no 
water fl ow

Loose connection on leads 
connected to Master-Trol

Piezo switch not working 

Filter blocked

Water supply pressure 
issue

Reconnect lead 
connections

Replace Piezo switch

Replace Piezo switch

Remove debris from ball 

Remove debris from ball 
valve fi lter

valve fi lter
C

Check that water is 
available to the inlet of 
the fl ush valve

Check inlet water supply 
pressure and that a 
minimum of 250kPa and 
a maximum of 500kPa is 
available

Water continues to run 
from the fl ush valve

Solenoid seat possibly 
fouled by debris or scale

Filter blocked 

Water supply pressure 
issue

Isolate the water supply 
and remove the solenoid 
valve. Take out the 
plunger and spring 
assembly and clean them 
using a soft brush. Use 
scale remover if required. 
Reassemble components 
ensuring the spring is in 
the vertical position and 
reinstall the solenoid

Remove debris from ball 
valve fi lter
Check inlet water supply 
pressure and that a 
minimum of 250kPa and 
a maximum of 500kPa is 
available

21

Summary of Contents for RBA1882-100-Series

Page 1: ...nce or safety Dimensions are subject to manufacturer s tolerance of 10mm Rough in should be completed with each fixture Important Installation Instructions are subject to change without notice Please...

Page 2: ...Installation Pg 19 4 0 Product Configuration Request Pg 20 5 0 Troubleshooting Pg 21 24 6 0 Maintence Pg 24 INSTALLATION OPERATION AND MAINTENANCE INSTRUCTIONS SYDNEY MELBOURNE BRISBANE PERTH AUCKLAND...

Page 3: ...nd 0800 722 111 www rbagroup co nz 3 1 0 Technical Requirements Installation must be undertaken in accordance with the PCA Plumbing Code of Australia and AS NZS3500 2 especially concerning probable si...

Page 4: ...0 Trouble Shooting Problem Probable Cause Solution Piezo button pressed no water flow Loose connection on leads connected to Master Trol Piezo switch not working Filter blocked Water supply pressure i...

Page 5: ...y Address Project Name or Site Address of Installation Quantity of RBA1882 100 Required Water Supply Inlet Pressure on site WELS Rating Required to match WC pans I request that the RBA1882 100 s are c...

Page 6: ...tallation RBA1882 100 007 Fit the flush valve in the required position maintaining a minimum 700mm distance between the outlet of the vacuum breaker and the centre line of the flush pipe connected to...

Page 7: ...he bottom to the ceiling pace where controller is to be mounted Mount Piezo Indicator ring assembly on the wall with silicone FFL 335 Min 700 184 FFL 40mm FLUSH PIPE Supplied by others 23mm PENETRATIO...

Page 8: ...TION OPERATION AND MAINTENANCE INSTRUCTIONS SYDNEY MELBOURNE BRISBANE PERTH AUCKLAND Australia 1300 788 778 www rba com au New Zealand 0800 722 111 www rbagroup co nz RBA1882 100 003 005 Installation...

Page 9: ...the WC pan inlet Install mounting bracket into noggins Fit piezo buttons to face plate and connect flush lead to point 1 and full flush lead to point 2 Secure plate to mounting bracket using screws pr...

Page 10: ...5mm2 INSTALLATION OPERATION AND MAINTENANCE INSTRUCTIONS Fit the flush valve in the required position maintaining a minimum 700mm distance between the outlet of the vacuum breaker and the centre line...

Page 11: ...imum 700mm distance between the outlet of the vacuum breaker and the centre line of the lush pipe connected to the WC pan inlet Note Contact RBA for performance assessment It is recommended that a loo...

Page 12: ...4V AC Settings have been made in house to deliver 6 3L flush volume Din plug wiring connection has been completed in house to allow for batch test release The unit is low voltage 24V AC so polarity is...

Reviews: