Component Check List: Supplied

Description

Quantity

SNWC

SNWCG

Glass Side Panel

1

Standard Cover Trims

2

4

Standard Wall Profile(s)

1

2

Top Cap(s)

1

2

Return Panel

1

1

90º Degree Brackets

2

2

Front Glass Panel

1

1

45º Degree Brackets

4

4

Angled Glass Panel

1

1

First Glass Panel

1

1

Equipment Check List: Not Supplied

Description

PZ2 Pozidrive screwdriver
Bathroom Sealant Gun
Spirit Level (large)
Mains or battery Drill
6mm Masonry Bit
Tape Measure
Panel
Allen Keys (supplied)
Torque Wrench

Installation Site Preparation - Site Requirements

Walls

The walls to which the enclosure is to be fitted to

must be completely vertical

with no more than 5mm deviation. A

maximum of 5mm adjustment is provided within the enclosure to take account for untrue walls.

Tray

If fitting to a tray the following requirements

must

be met before installation can commence:

I

The tray must be a Roman product.

I

The tray must be fitted in accordance to the Roman instruction manual supplied with the tray.

I

Any tiling must not overhang the tray by more than 5mm. The tray can be made offset from the wall to achieve
this

(see image on next page)

I

Any tiling and sealing around the tray and enclosure must be completed and fully dry.

Wetroom Installation

For wetroom Installation an F20 glass / floor protector is recommended. Please contact customer relations on 01325
328034 to request your pack.

SNWCB & SNWCGB/May 10

S c u l p t u r e s

Angled Walk-in

Instruction Manual

IMPORTANT

I

Please ensure the consumer guarantee card enclosed with this
product is completed and returned to Roman; please ensure the end
user retains this manual.

I

Please read all instructions carefully before attempting installation.

I

Handle the product with care to avoid damage to the product finish.

I

Check for hidden electrical cables and water pipes prior to
commencing any drilling work.

I

Images are used for illustration purposes only, product designs may
differ slightly as a result of continuing product development.

I

Roman Sculptures enclosures are heavy, this enclosure installation
must be carried out by a minimum of two people to avoid possible
lifting injury and damage to the large glass panels.

I

Roman’s toughened glass is completely safe for use in our shower
enclosures and bath screens; providing our products are installed
according to our guidelines.

I

It is important to note, that the glass must not be mounted or
‘pinched’ in such a way that would cause a stress point to develop in
the glass. In addition, it must not be subjected to any sharp impact
or severe temperature fluctuation which may also cause a stress
point to develop in the glass.

I

Roman’s toughened glass is physically and thermally significantly
stronger than standard glass. During our toughening process the
stresses contained within any glass are balanced so if in the unlikely
situation any of the above occurs and the glass breaks, the glass will
shatter safely into small thumbnail sized blunt fragments.

SNWC & SNWCG

SNCW-SNWCG:CQB

14/5/10  11:35  Page 1

Summary of Contents for SNWC

Page 1: ... p t u r e s Angled Walk in Instruction Manual IMPORTANT I Please ensure the consumer guarantee card enclosed with this product is completed and returned to Roman please ensure the end user retains this manual I Please read all instructions carefully before attempting installation I Handle the product with care to avoid damage to the product finish I Check for hidden electrical cables and water pi...

Page 2: ...re fitting in conjunction with the integrated water delivery you must refer to the valve fitting instructions before installing your enclosure or tray Under floor preparation will be required to accommodate the valve prior to the installation of the enclosure tray or final construction of the wet room Step 1 Checking Sealing the tray Please make sure the purchaser end user completes and returns th...

Page 3: ...th the glass groove in the tray the outside edge of the wall profile will be approximately 15mm in from the outside edge of the tray 2 Drill the holes using 6mm masonry drill bit not supplied Push the wall plugs supplied into the drilled holes 3 Apply a bead of silicon the width of the wall profile at the bottom where it meets the tiled wall Important failure to carry out this procedure can result...

Page 4: ...ve the allen bolts and spacers from the back plates on both 45 degree brackets fit the 45 degree brackets to the first panel and the angled glass panel in order as shown above If fitting with the integrated water delivery please ensure your glass panel is the correct way up when installing Once the 45 degree brackets have been assembled onto the first panel and angled panel the allen bolts must be...

Page 5: ...ngled panel as shown above failure to do so will cause sealing problems in Step 5 3 Using the same procedure in line 1 fit the 90 brackets to the front panel and the return panel in order as shown above Once the 90 degree brackets have been assembled onto the front panel return panel the allen bolts must be tightened to 10Nm using a torque wrench Ensure the allen bolts face in towards the showerin...

Page 6: ...f the wall profiles inside and outside vertically where they meet the tiled wall Very important Failure to follow the procedure in lines 2 4 may result in serious water damage and is not covered under the terms of the guarantee Ensure the sealant is less than 3mm thick this ensures that the sealant dries clear Please allow 24 hours for the bathroom sealant to fully cure prior to using the enclosur...

Page 7: ...portant no sealant should be present between the wall profile and the tiled wall vertically prior to screw fixing 5 Using an allen key loosen the screws down the side of the wall profile by 3 turns 6 Position the flexible seal onto the end of the side panel Offer the side panel fully into the wall profile then tighten all the allen screws down the side of the wall profile using the supplied allen ...

Page 8: ...lations on 01325 328034 No Description SNWC Qty SNWCG Qty 1 Glass Side Panel 1 2 Cover Trims 2 4 3 Wall Profiles 1 2 4 Top Caps 1 2 5 Return Panel 1 1 6 90º Degree Brackets 2 2 7 Front Glass Panel 1 1 8 45º Degree Brackets 4 4 9 Angled Glass Panel 1 1 10 First Glass Panel 1 1 SNCW SNWCG CQB 14 5 10 11 35 Page 8 ...

Page 9: ...led surface or a similar sealed surface ALIGNMENT 2 Check that the the wall profiles have been fitted directly in line with the groove in the tray Step2 line 1 Step 6 line 1 if fitting in conjunction with a side panel 3 Check that the wall profiles have been fitted completely vertical the bubble must be in the centre of the two lines on a spirit level Step 2 line 1 Step 6 line 1 if fitting in conj...

Page 10: ...assemblies and other moving parts from time to time It is strongly recommended that a quality silicone spray is used A list of Don ts 1 Don t use acidic based products which are unsuitable for cleaning enamel surfaces 2 Don t use Abrasive cleaners or cleaners containing bleach or solvents these products will adversely affect the finish of the aluminium profiles 3 Don t use scouring pads powder or ...

Page 11: ...RHAM DL5 6YN ENGLAND UK www roman showers com GENERAL RECEPTION PHONE 44 0 1325 311318 FAX 44 0 1325 319889 CUSTOMER RELATIONS PHONE 44 0 1325 328034 FAX 44 0 1325 328031 SALES ENQUIRIES PHONE 44 0 1325 328033 FAX 44 0 1325 328027 SNCW SNWCG CQB 14 5 10 11 35 Page 12 ...

Reviews: