Typical wiring diagram

3.  Attach mounting brackets as required with M6 screws/washers provided. Tighten 

to 10Nm. (see Bracket Orientation Diagram)

4.  Open terminal block enclosure.
5.  Installer should earth the unit separately – an internal and external earth point are  

provided as standard.

6.  Connect wires to mains supply.
7.  If the unit is to be opened for any reason, disconnect mains.
8.  All SPARTAN floodlights/highbay have terminal blocks suitable for looping 4mm2  

cable, only one cable should be connected to each terminal block connection – 

when  incoming cables are installed a creepage and clearance of 5mm and 4mm 

respectively.

9.  Ensure no cables are trapped and gasket is seated correctly and replace terminal  

cover, tighten to 4Nm

10.  If carrying out Insulation Resistance tests the normal method of insulation testing  

is to connect Live and Neutral together and test between this point and Earth to  

prevent the risk of damage to the electronic control gear.

Wire the Mains cable into the terminal block. Provision has been made for this and identified  

as the E (Earth), L1 (Switched Live), L2 (permanent live) and N (Neutral) terminals. There are  

two pairs of contacts for each of these to facilitate a mains cable that can be looped in and  

out of the unit. The L2 terminals on a standard unit are not electrically connected but allows  

them to be used on the same circuits as 

emergency units.

LIGHT ENGINE

LID

N   E   L1 L2

PSU / TERMINAL BOX

J1 +ve

J2 -ve

RETENTION CORD

RED +ve BLACK -ve

MAINS INPUT

110-277V AC

WIRING Z1 & Z2

BROWN

GREEN

BLUE

Summary of Contents for SPARTAN MP Series

Page 1: ...tallation 3 Maintenance 4 Technical Specification 5 Trouble Shooting The SPARTAN MP series of explosion protected floodlights highbay are specialist devices certified for use in specific operating env...

Page 2: ...he environment the SPARTAN unit will be installed in Zone 1 and Zone 2 Hazardous areas 5 Check certification nameplate on front of floodlight to ascertain type of threaded cable entry on the luminaire...

Page 3: ...ing points must be used the fixing points must be suitable for the conditions of use 2 The line diagrams below are for guidance only units may be mounted in any orientation Mounting MP SPARTAN Unit Fl...

Page 4: ...4 www raytecled com UK Europe Tel 44 0 1670 520055 Americas Tel 1 613 270 9990 Mounting SPARTAN Unit Highbay Application 55 39 28 1 3 361 386 350...

Page 5: ...ly 9 Ensure no cables are trapped and gasket is seated correctly and replace terminal cover tighten to 4Nm 10 If carrying out Insulation Resistance tests the normal method of insulation testing is to...

Page 6: ...remove the terminal enclosure cover to get access to the power supply Remove the power supply from the mains terminals then remove LED wires white and white with red mark 5 Disposal of packaging SPAR...

Page 7: ...r Factor 230Vac full load 0 97 Mains Frequency 50 60Hz Inrush Current Ipeak 50 53A t 300 s Total Harmonic Distortion 230Vac full load 10 IP Rating IP66 67 Weight std 13 2Kg 13 2Kg Dimensions See previ...

Page 8: ...Park Rotary Parkway Ashington Northumberland NE63 8QW United Kingdom Description of Equipment Spartan range of Mid Power Floodlights Certification Body CML New Port Road Ellesmere Port CH65 4LZ Certi...

Page 9: ...and Safety Requirements has been assessed by reference to the following harmonised designated standards EN 60079 0 2018 EN60079 7 2015 A1 2018 EN 60079 18 2015 A1 2017 EN60079 31 2014 And also 2014 35...

Page 10: ...com Raytec Ltd Unit 15 Wansbeck Business Park Rotary Parkway Ashington Northumberland NE63 8QW United Kingdom Tel 1 613 270 9990 sales raytecled com Raytec Systems Inc 800 300 Terry Fox Drive Ottawa...

Reviews: