background image

6

www.raytecled.com

UK / Europe Tel: +44 (0) 1670 520055

Americas Tel:  +1 613 270 9990

3. Maintenance

4. Troubleshooting

1.  It  is  essential  that  all  SPARTAN  units  are  maintained  in    accordance  with  the  

requirements  of  the  EN60079-17  standard:  (Electrical  apparatus  for  explosive  gas  

atmospheres – other than mines).

2. 

IMPORTANT

.    No  modifications  are  permitted  to  the  unit,  all  spare  parts  must  be  

purchased  from  the  manufacturer,  unauthorized  modifications  or  spare  parts  will  

invalidate certification and make the equipment dangerous.

3.  Isolate the SPARTAN unit from the mains supply and allow to cool before carrying out  

any maintenance work.

4.  The unit has one power supply; in the event that a power supply needs to  be replaced 

remove the terminal enclosure cover to get access to the power supply. Remove  the 

power supply from the mains terminals then remove LED wires (white and white with 

red mark. 

5.  Disposal  of  packaging,  SPARTAN  units  and  old  LED  assemblies/power  supplies  

should be carried out in accordance with national regulations.

 

1.  Ensure the two LED boards are correctly wired to terminal block. White/Red to White/

Red : White to  White – paired cables.

2.  Ensure Mains input is correctly connected.
3.  Ensure Mains Input is turned on at the source.

PROTECTION/CERTIFICATION

PROTECTION/CERTIFICATION – ZONE 1/21 VARIANTS
CML21ATEX3317 or IEC Ex CML21.0037 or CML21UKEX3319

II 2 GD Ex eb mb IIC T4 Gb  

Ex tb IIIC T90°C Db

Ta -40°C to +60°C

IP66/IP67 110-277V AC

PROTECTION/CERTIFICATION – ZONE 2/22 VARIANTS
CML21ATEX3320 or IEC Ex CML21.0038 or CML21UKEX3321

II 3 GD Ex ec mc IIC T4 Gc  

Ex tc IIIC T90°C Dc

Ta -40°C to +60°C

IP66/IP67 110-277V AC

Summary of Contents for SPARTAN MP Series

Page 1: ...tallation 3 Maintenance 4 Technical Specification 5 Trouble Shooting The SPARTAN MP series of explosion protected floodlights highbay are specialist devices certified for use in specific operating env...

Page 2: ...he environment the SPARTAN unit will be installed in Zone 1 and Zone 2 Hazardous areas 5 Check certification nameplate on front of floodlight to ascertain type of threaded cable entry on the luminaire...

Page 3: ...ing points must be used the fixing points must be suitable for the conditions of use 2 The line diagrams below are for guidance only units may be mounted in any orientation Mounting MP SPARTAN Unit Fl...

Page 4: ...4 www raytecled com UK Europe Tel 44 0 1670 520055 Americas Tel 1 613 270 9990 Mounting SPARTAN Unit Highbay Application 55 39 28 1 3 361 386 350...

Page 5: ...ly 9 Ensure no cables are trapped and gasket is seated correctly and replace terminal cover tighten to 4Nm 10 If carrying out Insulation Resistance tests the normal method of insulation testing is to...

Page 6: ...remove the terminal enclosure cover to get access to the power supply Remove the power supply from the mains terminals then remove LED wires white and white with red mark 5 Disposal of packaging SPAR...

Page 7: ...r Factor 230Vac full load 0 97 Mains Frequency 50 60Hz Inrush Current Ipeak 50 53A t 300 s Total Harmonic Distortion 230Vac full load 10 IP Rating IP66 67 Weight std 13 2Kg 13 2Kg Dimensions See previ...

Page 8: ...Park Rotary Parkway Ashington Northumberland NE63 8QW United Kingdom Description of Equipment Spartan range of Mid Power Floodlights Certification Body CML New Port Road Ellesmere Port CH65 4LZ Certi...

Page 9: ...and Safety Requirements has been assessed by reference to the following harmonised designated standards EN 60079 0 2018 EN60079 7 2015 A1 2018 EN 60079 18 2015 A1 2017 EN60079 31 2014 And also 2014 35...

Page 10: ...com Raytec Ltd Unit 15 Wansbeck Business Park Rotary Parkway Ashington Northumberland NE63 8QW United Kingdom Tel 1 613 270 9990 sales raytecled com Raytec Systems Inc 800 300 Terry Fox Drive Ottawa...

Reviews: