PILOT BURNER FLAME-IID
(atmospheric units)
Inspect on the first and third month after initial start-
up and then on an annual basis. If problems are found,
refer to the Troubleshooting sections of this manual for
additional directions.
1.
Remove top of heater and inspect heat exchanger
for soot and examine venting system.
2.
Remove rear header and inspect for scale depos-
its.
*3. Inspect pilot and main burner flame and firing rate.
*4. Inspect and operate all controls and gas valve.
*5. Visually inspect system for water leaks.
*6. a.
Oil pump motor and bearing assembly, if oil
cups are provided.
b. Disconnect pump from header and check
condition of pump impeller. Check condition of
bearing by attempting to move impeller from
side to side. Replace any parts showing wear.
c.
Check pump coupler for wear and vibration.
7.
Check flow switch paddle.
8.
Clean room air intake openings to assure
adequate flow of combustion and ventilation air.
CAUTION:
Combustion air must not be contaminated
by corrosive chemical fumes which can damage the
heater and void the warranty.
9.
Keep heater area clear and free from combustible
materials, gasoline, and other flammable vapors
and liquids.
*Should be checked monthly.
(Takes approximately 15 minutes).
INSPECTION PROCEDURES
34
Fig# 9336
Summary of Contents for 0133-4001 WH
Page 19: ...19 FLOW RATES...
Page 21: ...21 TYPE WH UNITEMP 80 SYSTEM PIPING DIAGRAMS...
Page 28: ...LOCATION OF CONTROLS 28 400 WH1 WH2 WH3 181 LOW NOx WH1 Fig 9360...
Page 29: ...29 Fig 9334 LOCATION OF CONTROLS...
Page 38: ...WIRING DIAGRAM WH2 182 260 38 WIRING DIAGRAMS...
Page 39: ...WIRING DIAGRAM WH2 330 400 39...
Page 40: ...40 WIRING DIAGRAM WH2 514 624...
Page 41: ...41 WIRING DIAGRAM WH2 724 1336...
Page 42: ...42 WIRING DIAGRAM WH2 1414 1826...
Page 43: ...43 WIRING DIAGRAM WH2 2100 2500...
Page 44: ...44 WIRING DIAGRAM WH2 3001 4001...
Page 45: ...WIRING DIAGRAM WH1 181 261 LOW NOx 45...