4.3 Flush mounting
You can mount the display in a flush or panel mounting arrangement.
Before mounting the unit, ensure that you have:
• Selected a suitable location.
• Identified the cable connections and route that the cables will take.
• Detached the front bezel.
D
12168-1
1. Check the selected location for the unit. A clear, flat area with
suitable clearance behind the panel is required.
2. Fix the appropriate cutting template supplied with the product, to
the selected location, using masking or self-adhesive tape.
3. Using a suitable hole saw (the size is indicated on the template),
make a hole in each corner of the cut-out area.
4. Using a suitable saw, cut along the inside edge of the cut-out line.
5. Ensure that the unit fits into the removed area and then file
around the rough edge until smooth.
6. Drill 4 holes as indicated on the template to accept the securing
screws.
7. Place the gasket onto the display unit and press firmly onto the
flange.
8. Connect the power, data and other cables to the unit.
9. Slide the unit into place and secure using the provided screws.
Note:
The appropriate torque to use when drilling depends on the
thickness of the mounting surface and the type of material.
Note:
The supplied gasket provides a seal between the unit and
a suitably flat and stiff mounting surface or binnacle. The gasket
should be used in all installations. It may also be necessary to
use a marine-grade sealant if the mounting surface or binnacle is
not entirely flat and stiff or has a rough surface finish.
Location and mounting
69
Summary of Contents for e7
Page 2: ......
Page 4: ......
Page 12: ...12 e7 e7D Installation instructions...
Page 64: ...64 e7 e7D Installation instructions...
Page 74: ...74 e7 e7D Installation instructions...
Page 88: ...88 e7 e7D Installation instructions...
Page 108: ...108 e7 e7D Installation instructions...
Page 122: ...122 e7 e7D Installation instructions...
Page 123: ......
Page 124: ...www raymarine com...