![Rayleigh Instruments RI-ENERGYFLOW-3P-MODULAR... User Manual Download Page 55](http://html1.mh-extra.com/html/rayleigh-instruments/ri-energyflow-3p-modular/ri-energyflow-3p-modular_user-manual_3930940055.webp)
55
Menu
Level 1
Menu
Level 2
Menu
Level 3
Menu
Level 4
Menu
Level 5
Menu Level
6
Default
Selection
Comment
d
New password
programming password.
Confirm new password
Maintena
nce
User cannot access
Not accessible to user.
Factory
RESET
Cancel
Cancel
Resets the system to factory
default settings.
Confirm
Auto
Test
Only applicable in Italy
Only applicable in Italy.
CT self-
check
Cut off all load then comfirm
This action must be
performed when the inverter
is externally connected to the
CT.
Before the CT self-check, the
inverter needs to be
connected to the power grid
and the battery. The backup
circuit breaker and normal
load breaker needs to be
disconnected. The CT self-
check takes about 1~5
minutes.
Inquire
INV Module
Shows the user what model
of inverter is in use.
Module SN
Shows the user the serial
number of the inverter.
Firmware
Shows the user the firmware
version.
Record
Shows the user the active
faults or errors.
BMS Info
Shows the user the battery
modules connected and
connection state.
Statistic
Time stat
Run:
Shows the user the hours run
of Inverter and Grid
connection.
Grid:
Summary of Contents for RI-ENERGYFLOW-3P-MODULAR...
Page 4: ...4...
Page 12: ...12 Accessory Cable PACK10 2 Accessory Cable PACK20 4 Accessory Cable PACK30 6...
Page 13: ...13 Accessory Cable PACK40 8...
Page 14: ...14...
Page 28: ...28 Figure 17 Wiring the Communication Cable...
Page 30: ...30 Figure 19 PV Wiring Step12 Close the lid and tighten the screw Figure 20...
Page 58: ...58...