![Rayleigh Instruments RI-ENERGYFLOW-3P-MODULAR... User Manual Download Page 35](http://html1.mh-extra.com/html/rayleigh-instruments/ri-energyflow-3p-modular/ri-energyflow-3p-modular_user-manual_3930940035.webp)
35
Figure 28 Hybrid-coupled system
3. System Operation
3.1 Switch On
When turning on the system, it is very important to follow the steps below to prevent
damage to the system.
WARNING:
Please check the installation again before turning on the system.
S t e p 1 : Turn on the battery switch on the battery pack .
S t e p 2 : Press power button on all the batteries until the indicator lights turn on.
Summary of Contents for RI-ENERGYFLOW-3P-MODULAR...
Page 4: ...4...
Page 12: ...12 Accessory Cable PACK10 2 Accessory Cable PACK20 4 Accessory Cable PACK30 6...
Page 13: ...13 Accessory Cable PACK40 8...
Page 14: ...14...
Page 28: ...28 Figure 17 Wiring the Communication Cable...
Page 30: ...30 Figure 19 PV Wiring Step12 Close the lid and tighten the screw Figure 20...
Page 58: ...58...