PCB Board Replacement
Work Instructions
11. Replace the top and bottom 8 or 10 mm bolts (Fig I & J).
12.
QC INSPECTION:
Steps 7 – 11 must be verified by
Quality Control.
13. Re-attach the switch cover.
14. Replace the fender extension with the 5 mm Allen
wrench.
15.
QC INSPECTION:
Steps 12 and 13 must be verified by
Quality Control.
16. Close the service hatch.
I
J
17. Place the old PCB board in a box marked for quarantine.
D e n v e r G l ob a l P r o duc t s 1 000 E as t P o we ll D r. | Li nc ol nt o n , N C 2 80 9 2 U. S . A
© 2 0 1 4 D en v e r Gl o b a l P ro du c t s | RATO A ll r i gh t s r es e rv e d .
Summary of Contents for MPV-7100
Page 1: ...Raven 7100 Service Manual ...
Page 2: ...12v Battery Exchange ...
Page 4: ...12 Volt Relay Exchange ...
Page 6: ...48 Volt Battery Pack Removal ...
Page 8: ...Blade Motor Controllers ...
Page 11: ...Carburetor Replacement ...
Page 16: ...Contactor Fuse Replacement ...
Page 21: ...Drive Motor Controller Replacement ...
Page 27: ...Gas Gauge Check Replacement ...
Page 30: ...Oil Separator Replacement ...
Page 33: ...PCB Replacement ...