Drive Motor Control
Installation Instructions
8. Locate red power cable and place onto the red power
post, install M8 Flat Washer, Lock Washer and Hex
Nut and tighten with 13mm wrench (Fig. H).
9. Repeat Step 8 for black cable and black ground post.
10. Locate white plug and receptacle and reconnect (Fig. I).
11. Locate the (2) plugs under the large rubber boot and
reconnect to their corresponding receptacles (Fig. J).
12. QC INSPECTION:
Steps 8 - 11 must be checked and
verified by Quality Control.
13. Place plugs back inside rubber boot.
M8 Nut, Flat
Washer &
Lock Washer
Red Power
Post
13mm
Wrench
Wiring
From DMC
H
D e n v e r G l ob a l P r o d uc t s 1 000 E as t P o we l l D r. | Li nc ol nt o n , N C 2 8 09 2 U. S . A
© 2 0 1 4 D e n v e r G lo b a l P r o du c t s | RATO A l l r ig ht s r es e rv e d .
Rubber
Boot
Reconnect
Remaining (3)
Plugs Under
Rubber Boot
J
I
Summary of Contents for MPV-7100
Page 1: ...Raven 7100 Service Manual ...
Page 2: ...12v Battery Exchange ...
Page 4: ...12 Volt Relay Exchange ...
Page 6: ...48 Volt Battery Pack Removal ...
Page 8: ...Blade Motor Controllers ...
Page 11: ...Carburetor Replacement ...
Page 16: ...Contactor Fuse Replacement ...
Page 21: ...Drive Motor Controller Replacement ...
Page 27: ...Gas Gauge Check Replacement ...
Page 30: ...Oil Separator Replacement ...
Page 33: ...PCB Replacement ...