Operation QUANTRON-A
4
46
4.6.6
Calibration
In this menu, you can determine the flow factor based on a calibration and save
it in the control unit.
Carry out the calibration test:
before spreading for the first time.
If the fertiliser quality has changed significantly (moisture, high
dust content, cracked grain).
if a new fertiliser type is used.
The calibration test must be carried out with engaged PTO shaft at a standstill or
during travel over a test section.
Remove both spreading discs.
Set the drop point to calibration position (AGP 0).
Entering the working speed:
1.
Open the
Fertiliser settings > Start calibration
menu.
2.
Enter the average working speed.
This value is required to calculate the slider position during calibration.
3.
Press the
Enter key
.
The new value is saved in the control unit.
The
Move to drop point (AXIS only)
alarm message appears in the dis-
play.
4.
Press the
Start/Stop
key.
The drop point is activated.
The alarm is cleared.
The
Prepare calibration test
operating screen is displayed.
NOTICE
The
Calibration
menu is locked for the
M EMC function
and in the
AUTO km/h + AUTO kg
operating mode. This menu item is inactive.
n
CAUTION
Risk of injury due to automatic drop point adjustment
With machines equipped with electrical drop point actuators,
the
Move to drop point
alarm message appears. When the
Start/Stop
function key is pressed, the drop point automatically
moves to the pre-set value using the electrical actuating cylinders.
This may cause injury and material damage.
Before pressing
Start/Stop
, ensure that
nobody
is present
in the danger zone of the machine.
Summary of Contents for QUANTRON-A AXIS-M 20 Q
Page 6: ...Table of Contents IV...
Page 10: ...User instructions 1 4...
Page 16: ...Layout and function 2 10 Figure 2 5 Control unit display example MDS operating screen 3 11...
Page 24: ...Layout and function 2 18...
Page 92: ...Operation QUANTRON A 4 86...
Page 104: ...Spreading operation with the QUANTRON A control unit 5 98...
Page 114: ...Index D...
Page 116: ......