When accepting the machine, please check the completeness of the delivery.
The standard equipment includes:
•
1 solid fertilizer spreader of the series, MDS
•
1 operator’s manual MDS
•
1 calibration kit comprising chute and calculator
•
Lower link and upper link pins
•
1 agitator
•
Protective grid in hopper
•
Spreading disc set (according to order)
•
1 universal drive shaft (including operator’s manual)
•
Version Q or W: QUANTRON-A control unit (including operator's manual)
•
Version C: E-CLICK control unit (including operator's manual)
Please also check any additionally ordered optional equipment.
Check for any transport damage or missing parts. Have any shipping damage confirmed by the
forwarding agent.
When receiving the machine, check that attached components are correctly and tightly positioned.
The right-hand and left-hand spreading discs must be mounted facing the direction of travel.
In case of doubt, please contact your dealer or the factory directly.
7.2
Tractor requirements
To ensure safe and correct use of the machine of the MDS series, the tractor must meet the necessary
mechanical, hydraulic, and electrical requirements.
•
Universal drive shaft connection: 1 3/8 inches, 6 splines, 540 rpm,
○
Alternatively, 8 x 32 x 38, 540 rpm
•
If the distance between the lower link hook and the rear wheel of the tractor is too small, use a
hydraulic upper link with a Tele
‑
Space drive shaft.
•
Oil supply: max. 200 bar, single or double-acting valve (depending on equipment) with hydraulic
metering slide actuator
•
Operating voltage: 12 V
•
Category I or category II three-point linkage (type-dependent).