u
Position the machine safely on the ground on a pallet.
Make sure the surface is even and safe!
u
Remove both spreading discs. See
11.8.1 Dismounting the spreading discs
u
Versions K/D/D Mono
Connect the hydraulic hoses for the hydraulic metering slide actuator to a hydraulic unit or tractor.
u
Versions C/Q/W
Connect the E-Click or QUANTRON control unit to the tractor.
u
Start the tractor/unit/transformer.
u
Close the metering slide.
u
Switch the tractor off and remove the ignition key or switch the unit/transformer off.
u
Versions K/D/D Mono/C
Set the stop on the application rate scale to position 130 (position 9 for seeds or slug pellets).
Start the tractor/unit/transformer.
Open the metering slide to the preset stop.
u
Versions Q/W
Open metering slides (position 130).
Stop at the test points (see operator’s manual for the control unit).
u
Switch the tractor off and remove the ignition key or switch the unit/transformer off.
u
Insert the lower link pin diameter = 28 mm
(adjustment lever diameter = 8 mm for
seeds or slug pellets) into the right-hand or
left-hand metering opening.
Fig. 68: Lower link pin in metering opening
Case 1:
Pin can be inserted into the metering opening and has less than 1 mm of play.
•
The setting is OK.
•
Remove pin from the metering opening.
•
Reinstall the spreading discs.
11. Maintenance and service
118
5902916
MDS 8.2/14.2/18.2/20.2
Summary of Contents for MDS 8.2
Page 150: ......