Table of Contents
II
Preparing for calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
4.1.1 Scope of delivery and assembly of the field test set. . . . . . . . . . . . . . . . . . . 18
4.1.2 Requirements and conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
4.1.3 Performing a spreading test at a working width of 24 m. . . . . . . . . . . . . . . . 20
4.1.4 Performing a spreading test at a working width of 24 m or greater . . . . . . . 21
4.1.5 Performing a spreading test at a working width of 36 m or greater . . . . . . . 22
AXMAT calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
4.2.1 Evaluate the results and correct if necessary . . . . . . . . . . . . . . . . . . . . . . . . 25
4.2.2 Adjusting the drop point . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
Operating the AXMAT function in spreading operation . . . . . . . . . . . . . . . . . . . . . . 32
Summary of Contents for AXMAT DUO
Page 8: ...User instructions 1 4 ...
Page 40: ...Alarm messages and possible causes 5 36 ...
Page 42: ...Index B ...
Page 44: ......