
Part IV Disassembly and Maintenance
69
4-4-7 Starting control box
a. Disassembly and assembly
(Only for automatic starter specification)
6×12mm(2)
Special screw Control box
Silicon
rectifier
Control box
mounting rack
Locking nut
Safety plate (5A)
Assembly:
Before installation, check
whether it is about to burn out.
Oil alarm device
Assembly:
Carry out installation by aligning
the hole of the control panel.
Control panel
Reset switch (1A)
Assembly:
Be careful not to invert the left side
and the right side.
Combination switch
Assembly:
During installation, the protrusion at
the fastening thread should be aligned
with the notch of the mounting rack
and the control panel.
Combination switch
Protrusion
Summary of Contents for R80
Page 1: ...R80 R420 Type V Horizontal Axis Maintenance Manual Chongqing RATO Technology Co Ltd...
Page 17: ...Part II Dimension and Torque 13 2 1 2 R300 V...
Page 18: ...Part II Dimension and Torque 14 2 1 3 R420 V...
Page 19: ...Part II Dimension and Torque 15...
Page 38: ...Part IV Disassembly and Maintenance 34 8 Oil listing label 9 Oil filling label...
Page 39: ...Part IV Disassembly and Maintenance 35...
Page 78: ......