Preparing for use
R&S
®
QAR50
19
User Manual 1179.4992.02 ─ 02
Figure 4-11: Attachment points for lifting equipment
1 = Attachment points for lying position (variant 1)
2 = Attachment points for lying position (variant 2)
3 = Attachment points for upright position
2. Screw the eye bolts that were part of the delivery securely into the mounting holes.
They sit tight if you cannot screw them any further into the mounting holes.
3. Attach lifting equipment as described in
4. Carefully move the R&S
QAR50 to its new location.
5. Remove the lifting equipment from the R&S
QAR50.
6. Remove the eye bolts from the mounting holes.
7. Screw the caps of the mounting holes back in (M8X16 screws).
4.4
Considerations for test setup
Integration of the R&S
QAR50 at the workplace
The R&S
QAR50 has several edges that are required by its functionality. To avoid
physical injuries like head lacerations, take care of an appropriate ergonomic integra-
tion of the device at the workplace, especially if frequent human interaction with the
device is expected.
Cable selection and electromagnetic interference (EMI)
Electromagnetic interference (EMI) can affect the measurement results.
Considerations for test setup