Operation - Page 21
COPYRIGHT © 2013 SANDVIK MINING AND CONSTRUCTION OY
Operation
455
5. OPERATION
5.1 OPERATING INSTRUCTIONS
RECOMMENDED USE
The hammer is designed to be used in breaking concrete, road surface or asphalt,
hard or frozen ground. It is also suitable for light trenching and benching
applications or in ground compacting. It can be also used in breaking small and soft
boulders. Your local dealer will gladly give you more information.
OPERATING CONDITIONS
Principle of installation
Almost all carriers meeting mechanical and hydraulic requirements can be used to
operate the attachment. See “Hammer specifications” on page 54. The product is
installed on the carrier much in the same manner as installing a bucket or other
attachments. A flange mounted attachment requires a separate mounting bracket.
The attachment is connected to a carrier's hydraulic circuit with an installation kit.
If the carrier is already equipped with an installation kit, the installation requires
only suitable hoses and fittings. If the carrier does not have suitable kit to run the
attachment, one must be built. This may require more complex installation
including new piping and additional valves such as directional valve and pressure
relief valve.
Suitable kits can be ordered from the manufacturer or local dealers, from carrier
manufacturers and their dealers or from third party suppliers.
Hydraulic oil
In general the hydraulic oil originally intended for the carrier can be used with this
product. See “Requirements for hydraulic oil” on page 36.
Operating temperature
The operating temperature is -20 °C (-4 °F) to 80 °C (176 °F). If the temperature is
lower than -20 °C (-4 °F), the hammer and tool have to be preheated before any
operations can begin, in order to avoid breaking the accumulator's membrane and
the tool. During operation they will remain warm.
Note: The temperature of the hydraulic oil must be monitored. Ensure that oil grade
and monitored oil temperature together guarantee correct oil viscosity. See “Oil
specifications” on page 37.
Summary of Contents for 455
Page 1: ...Original instructions 1 13 OPERATOR S MANUAL OM455ENG 113 HYDRAULIC HAMMER RAMMER 455 ...
Page 3: ...Operation Page 3 COPYRIGHT 2013 SANDVIK MINING AND CONSTRUCTION OY 455 OPERATION ...
Page 33: ...Lubrication Page 33 COPYRIGHT 2013 SANDVIK MINING AND CONSTRUCTION OY 455 LUBRICATION ...
Page 41: ...Maintenance Page 41 COPYRIGHT 2013 SANDVIK MINING AND CONSTRUCTION OY 455 MAINTENANCE ...
Page 53: ...Specifications Page 53 COPYRIGHT 2013 SANDVIK MINING AND CONSTRUCTION OY 455 SPECIFICATIONS ...
Page 58: ...COPYRIGHT 2013 SANDVIK MINING AND CONSTRUCTION OY Page 58 ...
Page 59: ...Page 59 COPYRIGHT 2013 SANDVIK MINING AND CONSTRUCTION OY ...