Specifications - Page 65
COPYRIGHT © 2020 SANDVIK MINING AND CONSTRUCTION OY
CE mark and EC Declaration of Conformity
255E
3. CE MARK AND EC DECLARATION OF CONFORMITY
EC DECLARATION OF CONFORMITY
Original
(Directive 2006/42/EC, Annex II. 1. A; Directive 2000/14/EC)
Manufacturer: Sandvik Mining and Construction Oy, Breakers Lahti
Address: Taivalkatu 8, FI-15170 Lahti, Finland
Herewith declares that the Rammer hydraulic hammer
Model: 255E
-
Is in conformity with all the relevant provisions of the Machinery Directive 2006/42/EC.
-
Is in conformity with all the relevant provisions of the Outdoor Equipment Noise Directive 2000/14/
EC.
The procedure applied for conformity assessment is "Internal control of production" (Annex V).
-
Is in conformity with the relevant provisions of the following other EU directives and regulations,
where applicable:
Radio Equipment Directive 2014/53/EU
Electromagnetic Compatibility Directive 2014/30/EC
-
And the following (parts/clauses of) standards have been applied:
EN ISO 12100 - Safety of machinery, General principles for design, Risk Assessment and risk reduction
DNV GL certified quality management system according to ISO 9001, Design and manufacture of product
Technical file and manufacturing conformity
N.N., Director R&D/E, is authorized to compile the technical file and confirms the product design to conform
with the essential health and safety requirements.
M.M., Director Supply, confirms compliance of the manufactured machinery with the technical file.
N.N. and M.M. are empowered to draw up this declaration of conformity.
Signed for and on behalf of Sandvik Mining and Construction Oy, Breakers Lahti
Place:
Taivalkatu 8, FI-15170 Lahti, Finland
Date:
dd.mm.yyyy
Signed: N.N.
Director R&D/E
Signed: M.M.
Director Supply
Model
Serial number
Measured sound power level:
LWA [dB]
Guaranteed sound power level:
LWA [dB]
255E
255EA
115
119
Summary of Contents for 255E
Page 1: ...Original instructions 8 20 OPERATOR S MANUAL OM255EENG 820 HYDRAULIC HAMMER RAMMER 255E...
Page 3: ...Operation Page 3 COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY 255E OPERATION...
Page 37: ...Lubrication Page 37 COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY 255E LUBRICATION...
Page 47: ...Maintenance Page 47 COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY 255E MAINTENANCE...
Page 59: ...Specifications Page 59 COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY 255E SPECIFICATIONS...
Page 67: ...Page 67 COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY...