COPYRIGHT © 2020 SANDVIK MINING AND CONSTRUCTION OY
Page 32 - Operation
Operation
255E
4. Use the excavator boom to press the hammer firmly against the object. Do not
pry the hammer with the boom. Do not press too hard or too gently with the
boom. The force is correct when the tracks start to lift slightly from the ground.
5. Place the tool against the object at a 90 degree angle. Avoid small irregularities
on the object which will break easily and cause either idle strokes or an
incorrect working angle.
Summary of Contents for 255E
Page 1: ...Original instructions 8 20 OPERATOR S MANUAL OM255EENG 820 HYDRAULIC HAMMER RAMMER 255E...
Page 3: ...Operation Page 3 COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY 255E OPERATION...
Page 37: ...Lubrication Page 37 COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY 255E LUBRICATION...
Page 47: ...Maintenance Page 47 COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY 255E MAINTENANCE...
Page 59: ...Specifications Page 59 COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY 255E SPECIFICATIONS...
Page 67: ...Page 67 COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY...