background image

VISIO GAS

INSTALLATION MANUAL (GB) 

VISIO 100 F
VISIO 100 LC
VISIO 100 RC
VISIO 100 3S 

Summary of Contents for VISIO 100 F

Page 1: ...VISIO GAS INSTALLATION MANUAL GB VISIO 100 F VISIO 100 LC VISIO 100 RC VISIO 100 3S...

Page 2: ...1st edition 10 05 2023...

Page 3: ...Remote control Balanced flue system Positioning flue terminals Placement and construction Distance to combustible material Fitting the frame optional Starting the gas fireplace Purging the gas pipe P...

Page 4: ...REQUIREMENTS Learn the structure and content of this manual before installation Pay special attention to the safety chapter and the included manuals Make sure you understand the instructions otherwis...

Page 5: ...otice or caution Visual sign illustrating a potential hazard INSTRUCTIONS FOR USING QR CODES You will find QR codes with links to video guides for different installations in several places within the...

Page 6: ...for a balanced flue system The fireplace has variable heating power and is fitted with a burner developed using the latest burner technology BEFORE INSTALLATION All local regulations and provisions m...

Page 7: ...mation label correspond to the gas type and supply pressure to which the appliance will be connected Install the appliance in accordance with the following instructions and the national and local appl...

Page 8: ...ot isolate the fireplace since an airflow around the unit is necessary Do not use fiberglass rockwool or any other sort of insulation material as this can create pungent odour and can produce discolou...

Page 9: ...30 0 3 10 50 30 120 0 9 0 6 3 6 TILLADTE AFVIGELSER FOR LINIE RE M L AFVIGELSE I MM 0 1 0 1 VINKELAFVIGELSE KORTESTE SIDE 0 5 3 pr 100 mm OV UV DELIVERY PACKAGING The fireplace is supplied secured to...

Page 10: ...uded for decoration of the combustion chamber and fine tuning of airflow and flame image CONTENTS 1 Logs qty 6 2 Filaments 1 bag 3 Secondary burners qty 2 4 Restrictors qty 3 5 Ember layer black grey...

Page 11: ...11 GB OVERVIEW OF REMOTE OPTIONS Remote control INTRODUCTION OVERVIEW OF ELECTRONIC COMPONENTS GV60 combination valve Receiver Light module and adapter 12V PUCK optional WiFi module optional...

Page 12: ...NENTS Follow the instructions on page 29 for installing electrical and gas components including a guide for synchronisation of the remote control and receiver BALANCED FLUE SYSTEM Read an introduction...

Page 13: ...ls Do not install the fireplace against a flammable rear wall Protect the ceiling if it is made of flammable material Comply to the fireproof distances stated in this manual See the exact distances on...

Page 14: ...eflected suction cups must not be used See page 48 about cleaning REMOVING THE GLASS 1 Find the two rotary flaps at the top of each side of the fireplace glass see the arrows 2 Turn the two rotary fla...

Page 15: ...the two metal edges on the glass and pull the glass towards the front 4 Lift the glass until it is free of the base frame Tilt the bottom of the glass out and then down 5 The glass can now be removed...

Page 16: ...EDURE 1 The position indicators are positioned in the top on each side of the fireplace frame see the circle NOTE There is a position indicator in the middle of the gas fireplace frame which ensures t...

Page 17: ...Make sure that the correct air settings have been made if not please make the necessary adjustments Follow the guide below for air setting natural gas or LPG INSTALLATION AIR SETTINGS FOR NATURAL GAS...

Page 18: ...hat the bottom bolts are tightened and that the burner is pressed against the bottom combustion chamber gasket 3 Remove the four fitted bolts on the bottom of the fireplace see the arrows PROCEDURE 1...

Page 19: ...pull the GV60 Combination Valve pipe and receiver towards the side where the inspection grate is desired to be positioned No further than 500 mm from the middle of the fireplace 5 Position the bottom...

Page 20: ...20 GB INSTALLATION OVERVIEW OF THE BURNERS Secondary burner Piezo electrode Main burner 1st thermocouple Pilot flame guide...

Page 21: ...e it must be ensured that the cross ignition from the pilot flame to the main burner functions and that ignition occurs easily with the secondary burners Pilot flame 2nd thermocouple for the main burn...

Page 22: ...he following ceramic logs must be used 1 2 3 4 5 6 A small elevation in log no 5 can be used for identification 1 Start by securing the two secondary burners in the fireplace s base plate NOTE The tip...

Page 23: ...23 GB 2 30 cm 1 32 cm 2 Place ceramic log no 1 against the back panel as shown in the photo 3 Then place ceramic log no 2 on the secondary burner to the right INSTALLATION...

Page 24: ...24 GB 4 Place ceramic log no 3 on the secondary burner to the left 5 Place ceramic log no 4 3 4 INSTALLATION 31 cm 31 cm 7 cm 0 5 cm...

Page 25: ...25 GB INSTALLATION 7 cm 7 cm 6 Place ceramic log no 5 so that it rests on log no 4 7 Place ceramic log no 6 so that it rests on log no 4 5 6 11 cm 5 5 cm 1 cm 10 cm 12 5 cm 7 cm 6 cm 11 cm...

Page 26: ...total on both sides of the gas fireplace over the LED lights It is important that the pieces of glass are distributed in a thin layer that just exactly covers the holes in the bottom of the fireplace...

Page 27: ...ember chips a mixture of the grey and the black chips WARNING Be aware that the main burner and pilot flame are kept free of all ornaments 12 Place the filament on the main burner for an extra glowin...

Page 28: ...p after 20 minutes the flames should be a clear yellow If the desired combustion is not achieved another restrictor can be installed The restrictors come in three different sizes INSTALLATION RESTRICT...

Page 29: ...TION INSTALLATION OF ELECTRICALAND GAS COMPONENTS CONNECTION DIAGRAM Use the diagram to get an overview of the individual electrical and gas components Pictures of the parts will be provided on the fo...

Page 30: ...ilure four AA batteries can be fitted in the receiver If batteries are used in the receiver the LED light and WiFi module will not operate LED box Power supply adapter 12V Receiver WARNING The power s...

Page 31: ...lve is 12 mm 3 8 Secure against leaks in all gas connections made Make sure that the gas is correctly connected Always install a stopcock and a measuring stud before the GV60 Combination Valve The sto...

Page 32: ...ut during e g service and maintenance The inspection grate also functions as a convention grate The retractable inspection grate is available in two different sizes Small inspection grate front 60 cm2...

Page 33: ...ton You now have 20 seconds to press the down ar row button on the remote control Hold the but ton in until you see the word conn on the remote control Then release the button 3 The remote will then c...

Page 34: ...adapter needed 130 200 Natural Draught Ontop Metalotherm USD system No adapter needed 130 200 Natural Draught M llink Grol Multi Vent system Adapter needed 130 200 Natural Draught Poujoulat DUOGAS sy...

Page 35: ...g the terminal 600 L From an opening in the car port e g door window into the dwelling 1200 M Vertically from a terminal on the same wall 1500 N Horizontally from a terminal on the same wall 300 P Fro...

Page 36: ...measuring spigot can be positioned here Make sure that the fireplace is completely insulated from combustible materials on all sides We recommend protecting the ceiling and floor with non combustible...

Page 37: ...mm to combustible material Make a protecting plate if the ceiling is combustible Non flammable materials Outlet convection Min 300 mm from the ceiling Min 150 mm from the back frame to combustible ma...

Page 38: ...B B A A B B Non flammable material Combustible material Min 500 mm to combustible material Min 150 mm from the back frame to combustible material Keep a free distance around the fireplace of 50 mm to...

Page 39: ...Min 250 mm 150 mm Min 300 mm 200 mm Min 350 mm 250 mm Min 400 mm 300 mm Min 450 mm INSTALLATION A B If you want to position flammable material above your fireplace you must follow these minimum requi...

Page 40: ...LLATION DISTANCE FROM GLASS TO COMBUSTIBLE SIDE WALL Combustible material Non flammable material Fireplace opening Fireplace opening Min 150 mm between edge of opening and wall 0 25 50 75 100 mm 125 1...

Page 41: ...vection 3 Outlet convection 4 Roof terminal 5 Wall terminal 6 Ceiling protection INSTALLATION The installation of Visio 100 F 100 LC 100 RC and Visio 100 3S must be fitted with convection openings whi...

Page 42: ...16 PROCEDURE TO FIT THE FRAME 1 Fit the frame in the top of the gas fireplace using the accompanying screws see the arrows 2 Place the bottom frame the magnets ensure that the frame is secure 3 Place...

Page 43: ...ce is lit it may cause condensation and fog the glass This condensation is normal and will disappear within 10 15 minutes as the glass and flue heats up Do not turn off the fireplace before all dew on...

Page 44: ...that the secondary burners remain lit 7 Switch off the fireplace completely The fireplace may only be ignited again after the thermocouple has cooled down This will take about 1 2 minutes Inlet press...

Page 45: ...justed by removing the plug for the pressure regulator 5 Turn off the fireplace to minimum load 6 The minimum burner pressure can be adjusted by the screw minimum rate orifice 7 After the pressure tes...

Page 46: ...Put the fireplace in maximum load by pressing twice quickly on the remote control CO measurement on minimum load 1 Push the until the secondary burners are shut off 2 Put the fireplace in minimum load...

Page 47: ...ve the secondary burners Remove the perforated plate 6 Vacuum the entire burner 7 If needed soot on the logs can be removed by a soft brush Clean the pilot burner assembly using a soft brush and a vac...

Page 48: ...checked for blockages Check the outside and inside of the fireplace for any damage and pay particular attention to gaskets Only original RAIS spare parts may be used CLEANING THE CERAMIC LOGS 1 Remov...

Page 49: ...he installation instructions or used according to the user manual In case of failure to comply with statutory or recommended installation regulations and in the event of any owner made changes to the...

Page 50: ...es not work Check the thermocouple with an ohmmeter Are the main and secondary burners burning for more than 30 seconds before it turns off Is there a flame by the ceramic logs 2nd thermocouple is int...

Page 51: ...No spark Reversed polarity in 1st thermocouple wiring Incorrect pilot orifice if valve has been converted from LPG to NG or vice versa F09 Fire is not responding No electric control of the fire The do...

Page 52: ...rrectly installed F13 F13 Contact Service Motor turns to pilot position Receiver temperature exceeds 80 C F14 F14 Contact Service 5 sec beep from the receiver Fire is not responding no ignition Receiv...

Page 53: ...NL PL PT SL SK TR I3P 50 G31 50 mbar 11 2 8 9 36 32 4 39 6 AT CH CZ DE NL SK I3B P 30 G30 30 mbar 11 7 9 4 27 2 24 5 29 6 BE BG CY DK EE FI FR GB GR HR HU IT LT MT NL NO RO SE SI SK TR I3B P 30 G31 30...

Page 54: ...e appliance is switched on Been burning for 45 minutes Single burner The appliance is switched on Been burning for 45 minutes 130 mm 200 mm Type of burner 3243512 Gas category I2H I2E I2ELL I2E I2L I2...

Page 55: ...urner The appliance is switched on Been burning for 45 minutes VISIO 8 Producer Model Interval Interval Concentric approvals Interval Interval Country code AT CH CZ DE NL SK Gas category I3P 50 I3 28...

Page 56: ...RAWINGS VISIO 100 F A A A A R 484 1089 405 916 144 5 994 n 1 9 9 n 1 3 1 497 635 5 684 60 145 406 544 394 968 399 5 Without frame With frame 484 1089 638 638 544 1002 406 968 G 393 G 9 8 A A A A 484 1...

Page 57: ...5 n 1 9 9 n 1 3 1 916 405 4 9 5 145 405 60 399 5 599 1141 979 393 544 Without frame With frame 635 484 1090 635 4 9 5 1 0 8 4 5 405 390 G 979 G 393 G 9 8 A A A A 635 5 684 484 1035 144 5 n 1 9 9 n 1 3...

Page 58: ...44 5 399 5 Without frame With frame 1090 484 635 635 390 G 979 G 393 G 405 9 8 495 1084 5 A A A A RAIS Visio Gas 10 484 635 5 684 1035 n 1 9 9 n 1 3 1 405 916 390 5 979 393 544 145 405 60 599 1141 1 0...

Page 59: ...5 393 544 60 405 145 3 399 5 599 1198 495 495 Without frame With frame 635 5 494 1076 635 5 1000 G 390 5 G 405 495 1198 393 G 9 8 DRAWINGS A A RAIS Visio Gas 100 43 39 3S 6541 1000 916 484 635 5 684 4...

Page 60: ...RAIS A S Industrivej 20 DK 9900 Frederikshavn Denmark www rais com...

Reviews: