![background image](http://html1.mh-extra.com/html/rais/attika-visio-series/attika-visio-series_installation-manual_3629977052.webp)
INSTALLATION MANUAL
Starting the gas fireplace
Learn how to start up the gas fireplace after installation in this section.
Pressure test
The fireplace is pre-set to provide the correct amount of heat (kW), which is described under the
specifications. There is no need for further adjustments. “Inlet pressure” (supply pressure to the gas
block) and “Burner pressure” (nozzle pressure) must ALWAYS be measured and if necessary, corrected
by an authorised heating and plumbing and gas installation technician.
1. Close the gas valve (Main Valve Knob)
2. Open the “Inlet pressure tap” on the gas valve and connect a manometer.
3. Check the measurement agrees with the pressure stated on the information plate.
4. Carry out a test of the fireplace at full power including the secondary burners, and when the
fireplace only has the pilot flame lit.
5. If the pressure is too low, check the size of the gas supply pipes to ensure this is correct.
6. If the pressure is too high (more than 5 mbar too high) the fireplace can still be installed but the
gas utility company must be contacted.
7. Loosen the screw to the “Outlet pressure tap” on the gas valve and connect a manometer.
8. Check that the measured pressure agrees with the pressure stated on the information plate.
9. The measured value must be within ± 10% of the stated pressure. This is not the case, contact
the supplier.
NB: After the pressure test is complete and the manometer has been removed, re-tighten the “pressure
tap” screws. Check the system for gas leaks.
51 - GB
GB
Summary of Contents for attika VISIO Series
Page 2: ......
Page 16: ...INSTALLATION MANUAL 5 Position the bottom grate above the burner 15 GB GB...
Page 26: ...INSTALLATION MANUAL INSTALLATION MANUAL 500 500 150 1000 50 Tunnel models 25 GB GB...
Page 72: ...INSTALLATION MANUAL DECLARATION OF PERFORMANCE 71 GB GB...
Page 73: ...INSTALLATION MANUAL DECLARATION OF PERFORMANCE GB 72 GB...
Page 74: ...INSTALLATION MANUAL DECLARATION OF PERFORMANCE 73 GB GB...
Page 75: ...INSTALLATION MANUAL DECLARATION OF PERFORMANCE GB 74 GB...
Page 76: ...INSTALLATION MANUAL DECLARATION OF PERFORMANCE 75 GB GB...
Page 77: ...INSTALLATION MANUAL DECLARATION OF CONFORMITY GB 76 GB...
Page 78: ...INSTALLATION MANUAL DECLARATION OF CONFORMITY 77 GB GB...
Page 98: ...INSTALLATIONSANLEITUNG 5 Bodengitter auf den Brenner legen 14 D D...
Page 108: ...INSTALLATIONSANLEITUNG INSTALLATIONSANLEITUNG 500 500 150 1000 50 Tunnelmodelle 24 D D...
Page 154: ...INSTALLATIONSANLEITUNG PR FBEST TIGUNG 70 D D...
Page 155: ...INSTALLATIONSANLEITUNG PR FBEST TIGUNG D 71 D...
Page 156: ...INSTALLATIONSANLEITUNG PR FBEST TIGUNG 72 D D...
Page 157: ...INSTALLATIONSANLEITUNG PR FBEST TIGUNG D 73 D...
Page 158: ...INSTALLATIONSANLEITUNG PR FBEST TIGUNG 74 D D...
Page 159: ...INSTALLATIONSANLEITUNG KONFORMIT TSERKL RUNG D 75 D...
Page 160: ...INSTALLATIONSANLEITUNG KONFORMIT TSERKL RUNG 76 D D...
Page 180: ...INSTALLATIONSVEJLEDNING 5 Plac r bundristen oven p burneren 14 DK DK...
Page 190: ...INSTALLATIONSVEJLEDNING INSTALLATIONSVEJLEDNING 500 500 150 1000 50 Tunnelmodeller 24 DK DK...
Page 236: ...YDEEVNEDEKLARATION 70 DK DK...
Page 237: ...INSTALLATIONSVEJLEDNING YDEEVNEDEKLARATION DK 71 DK...
Page 238: ...YDEEVNEDEKLARATION 72 DK DK...
Page 239: ...INSTALLATIONSVEJLEDNING YDEEVNEDEKLARATION DK 73 DK...
Page 240: ...YDEEVNEDEKLARATION 74 DK DK...
Page 241: ...INSTALLATIONSVEJLEDNING OVERENSSTEMMELSESERKL RING DK 75 DK...
Page 242: ...OVERENSSTEMMELSESERKL RING 76 DK DK...
Page 262: ...INSTALLASJONSVEILEDNING 5 Plasser bunnristen opp brenneren 14 NO NO...
Page 272: ...INSTALLASJONSVEILEDNING INSTALLASJONSVEILEDNING 500 500 150 1000 50 Tunnelmodeller 24 NO NO...
Page 318: ...INSTALLASJONSVEILEDNING YDEEVNEDEKLARATION 70 NO NO...
Page 319: ...INSTALLASJONSVEILEDNING YDEEVNEDEKLARATION NO 71 NO...
Page 320: ...INSTALLASJONSVEILEDNING YDEEVNEDEKLARATION 72 NO NO...
Page 321: ...INSTALLASJONSVEILEDNING YDEEVNEDEKLARATION NO 73 NO...
Page 322: ...INSTALLASJONSVEILEDNING YDEEVNEDEKLARATION 74 NO NO...
Page 323: ...INSTALLASJONSVEILEDNING SAMSVARSERKL RING NO 75 NO...
Page 324: ...INSTALLASJONSVEILEDNING SAMSVARSERKL RING 76 NO NO...
Page 344: ...INSTALLATIONSANVISNING 5 Placera bottengallret ovanp br nnaren 14 S S...
Page 354: ...INSTALLATIONSANVISNING INSTALLATIONSANVISNING 500 500 150 1000 50 Tunnelmodeller 24 S S...
Page 400: ...INSTALLATIONSANVISNING PRESTANDADEKLARATION 70 S S...
Page 401: ...INSTALLATIONSANVISNING PRESTANDADEKLARATION S 71 S...
Page 402: ...INSTALLATIONSANVISNING PRESTANDADEKLARATION 72 S S...
Page 403: ...INSTALLATIONSANVISNING PRESTANDADEKLARATION S 73 S...
Page 404: ...INSTALLATIONSANVISNING PRESTANDADEKLARATION 74 S S...
Page 405: ...INSTALLATIONSANVISNING F RS KRAN OM VERENSST MMELSE S 75 S...
Page 406: ...INSTALLATIONSANVISNING F RS KRAN OM VERENSST MMELSE 76 S S...
Page 407: ...INSTALLATIONSANVISNING FELS KNING FELS KNING Se bruksanvisningens avsnitt om fels kning S 77 S...
Page 435: ...TECHNICAL DRAWINGS TECHNICAL DRAWINGS 23 TECHNICAL DRAWINGS...
Page 436: ...TECHNICAL DRAWINGS 24 TECHNICAL DRAWINGS TECHNICAL DRAWINGS...
Page 437: ...TECHNICAL DRAWINGS TECHNICAL DRAWINGS 25 TECHNICAL DRAWINGS...
Page 438: ...TECHNICAL DRAWINGS 26 TECHNICAL DRAWINGS TECHNICAL DRAWINGS...