P/N R9340-0104 13 © 2010 RAILWAY EQUIPMENT CO.
REV B
5/11
13.
Adjustable air intake screens. To start the GHAB in a new location, set the
intake screens in the closed position. If there proves to be a moisture problem
where frost builds up on the intake screens, the intake screens can be set in the
open position to improve the airflow into the blower.
14.
The airflow switch differential setting is factory set on “D” which is for
elevations below 2000 ft. If your location is set at a higher elevation,
This differential setting will need to be adjusted. Adjust per the
following
instructions:
a. Remove the galvanized cover over the airflow switch.
b. Remove the cover from the airflow switch.
c. Adjust the differential wheel on the base of the airflow switch as
follows:
Below 2000 ft elevation, set Airflow Differential Wheel to “D”
Below 4000 ft elevation, set Airflow Differential Wheel to “C”
Below 6000 ft elevation, set Airflow Differential Wheel to “B”
Above 6000 ft elevation, set Airflow Differential Wheel to “A”
C. POINT
NOZZLES
AND TRACK DUCTS
REFER TO THE GHAB POSITIONING DRAWING FOR TRACK DUCT
AND POINT NOZZLE POSITIONS.
LH AND RH POINT/TRACK NOZZLE ASSEMBLIES
1.
Attach point/track nozzle assembly RH (P/N 9508-4000) and point/track nozzle
assy LH (P/N 9508-4001) to the openings in the tie duct. Position assemblies for
proper airflow direction.
2.
Assemble the individual track duct sections into two complete track duct sections.
The mid and heel sections contain splices wrapped around the outside of the duct.
Unhook the clips to remove the three cover pieces. The bottom can now be
removed from the duct.
To assemble the splice:
a. Center the bottom splice piece on the seam between the two track
ducts.
b. Connect the center cover piece over the seam. (NOTE: The center
cover piece has slots to contain the bolts on the track duct).
c. Finally, connect the two end cover pieces.
Summary of Contents for 934
Page 10: ...P N R9340 0104 10 2010 RAILWAY EQUIPMENT CO REV B 5 11 INTENTIONALLY LEFT BLANK...
Page 15: ...P N R9340 0104 15 2010 RAILWAY EQUIPMENT CO REV B 5 11 INTENTIONALLY LEFT BLANK...
Page 28: ...P N R9340 0104 28 2010 RAILWAY EQUIPMENT CO REV B 5 11...
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 62: ...P N R9340 0104 38 2010 RAILWAY EQUIPMENT CO REV B 5 11 INTENTIONALLY LEFT BLANK...