C. LOW AIRFLOW
1.
Check for obstructions in all ductwork and the air intake.
2.
If there is frost buildup on the air intake screens, move the screens
to the “open” position.
3.
Check the voltage and current levels on the blower motor.
4.
Make sure knockouts on the track duct are pushed all the way back
in the track duct.
5.
Check the spacing between the inlet cone and the blower wheel.
The gap should be less than 1/16 of an inch.
Summary of Contents for 934
Page 10: ...P N R9340 0104 10 2010 RAILWAY EQUIPMENT CO REV B 5 11 INTENTIONALLY LEFT BLANK...
Page 15: ...P N R9340 0104 15 2010 RAILWAY EQUIPMENT CO REV B 5 11 INTENTIONALLY LEFT BLANK...
Page 28: ...P N R9340 0104 28 2010 RAILWAY EQUIPMENT CO REV B 5 11...
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 62: ...P N R9340 0104 38 2010 RAILWAY EQUIPMENT CO REV B 5 11 INTENTIONALLY LEFT BLANK...