13. VOLTAGE FAULT PHASE 2:
Voltage fault phase 2 is set when phase 2 line voltage is either
above or below voltage setpoints.
14. VOLTAGE FAULT PHASE 3:
Voltage fault phase 3 is set when phase 3 line voltage is either
above or below voltage setpoints.
15. OPEN HEATER PHASE 1:
This fault occurs when phase 1 current is below the current
setpoint. Check for an open heater or heater fuse.
16. OPEN HEATER PHASE 2:
This fault occurs when phase 2 current is below the current
setpoint. Check for an open heater or heater fuse.
17. OPEN HEATER PHASE 3:
This fault occurs when phase 3 current is below the current
Setpoint. Check for an open heater or heater fuse.
D. ADVANCED FEATURES:
Advanced features allows access to extended menus. To access the extended
menu structure rotate selector dial either direction until desired menu appears.
Than move the mode switch either up or down until desired screen is found.
1. MAIN MENU
A. 1. AIR TEMP __ F
Ambient air temperature is displayed.
2.
PRESET VALUE __ F
Air temperature below which unit will operate – this value can be
changed on the SETPOINTS MENU.
B. AC FREQUENCY __ HZ
Line voltage frequency is displayed.
C. LINE VOLTAGE __ V
D. LINE CURRENT __ A
E. KWATTS TOTAL
Real time kilowatt use is displayed.
F. 1. KWH RESET
Display of accumulated KWH use since this register was last
Summary of Contents for 934
Page 10: ...P N R9340 0104 10 2010 RAILWAY EQUIPMENT CO REV B 5 11 INTENTIONALLY LEFT BLANK...
Page 15: ...P N R9340 0104 15 2010 RAILWAY EQUIPMENT CO REV B 5 11 INTENTIONALLY LEFT BLANK...
Page 28: ...P N R9340 0104 28 2010 RAILWAY EQUIPMENT CO REV B 5 11...
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 62: ...P N R9340 0104 38 2010 RAILWAY EQUIPMENT CO REV B 5 11 INTENTIONALLY LEFT BLANK...