Raider 40
Manual
Military version
3
1.2 RAIDER BREAK-in PROCEDURES
CAUTION
Failure to follow the Break-In Procedure in Owner’s Manual and special fuel mixture
requirements for break-in may lead to serious engine damage and shortened engine life.
To prevent serious engine damage and ensure long engine life, new engines, used engines with
new powerhead, used engines with newly rebuilt powerhead, and engines coming out of storage
must be run for a period of 10 hours in accordance with the break-in procedure.
First 10 Minutes
• Operate the engine at minimum idle speed
• Verify a steady stream of water from the cooling water check port and idle port on the engine,
indicating the water pump is functioning properly.
Next 50 Minutes (0.16 to 1 Hour)
DO NOT
operate the engine above 1/2 throttle.
DO NOT
maintain a constant throttle setting. Vary engine speed from 1/4 to 1/2 throttle every 15
minutes.
NOTE
For boats which come onto plane easily, use full throttle to quickly accelerate onto plane; then
immediately reduce throttle to 1/2 and maintain this speed.
Next Hour (1 to 2 Hours)
• Use full throttle to quickly accelerate boat onto plane; then immediately reduce throttle to 3/4 and
maintain this speed.
• At intervals, run engine at 3/4 throttle for 1 - 10 minutes; then return to 1/2 throttle for a cooling
period.
• Vary engine speed every 15 minutes.
• Check for water discharge from cooling water check port
Next Eight Hours (2 to 10 Hours)
• Run engine at 3/4 throttle.
• For short periods of time, run engine at full throttle and then reduce speed back to 3/4 throttle. As
this part of the break-in period progresses, open to full throttle for longer and longer periods of time,
but never longer than 5 minutes.
• Vary engine speed every 15 minutes.
DO NOT
exceed the Full Throttle RPM Range of the engine. See Engine Specifications.
After Break-in
• Re-torque cylinder head bolts to specification after engine has been run and cylinder head has
cooled to the touch.
Summary of Contents for 40
Page 2: ......
Page 9: ...Raider 40 Manual Military version Front View Raider 40 6 24 23 20 11 19 25 25 ...
Page 10: ...Raider 40 Manual Military version 7 Raider 40 Overview ...
Page 11: ...Raider 40 Manual Military version 3 1 CYLINDER CRANKCASE ...
Page 18: ...Raider 40 Manual Military version 15 2 29 1 345 00011 0 PISTON RING 1 STD 2nd ...
Page 21: ......
Page 26: ...Raider 40 Manual Military version I I I I I I 5 I I I I I I _ __ _ _ _ _ _ _ __ _ _ I ...
Page 28: ... 17 Raider 40 Manual Military version 3 6 Throttle Mechanism ...
Page 30: ... 19 Raider 40 Manual Military version 15 25 6 21 3 7 Tiller Handle 3 Fig 19 1 ...
Page 32: ... 21 Raider 40 Manual Military version 3 8 Magneto 20 I 6 7 16 22 I 20 16 1 12 1 ...
Page 45: ... 34 Raider 40 Manual Military version 3 12 Starter Lock Pull Starter 12 ...
Page 47: ... 36 Raider 40 Manual Military version Fig 12 STARTER LOCK 12 ...
Page 58: ... 47 Raider 40 Manual Military version 3 16 Shifter 1 Fig 14 38 19 17 ...
Page 60: ... 49 Raider 40 Manual Military version 3 17 Transom Bracket ...
Page 64: ... 55 Raider 40 Manual Military version 3 18 Reverse Lock Transom Bracket ...
Page 75: ... 66 Raider 40 Manual Military version ...
Page 78: ...Raider 40 Raider 40 Manual Military version Fuel Additive not included ...