6. GETTING STARTED
•
After the terminal is connected to power the ON/LOAD
diode starts to light.
•
Press
to start the operating system loading procedure.
Windows CE together with RADWAG software loading is signalled
by blinking the red diode ON/LOAD.
•
When the loading procedure is completed the main software
window appears.
7. KEYPAD OVERLAY
11
Summary of Contents for Y/KTPS Series
Page 2: ...2 JANUARY 2011...