What’s in this Guide 1
Quick Start
W
HAT
’
S
IN
THIS
G
UIDE
This Quick Start provides the basic steps required for getting your
SCOPIA
100
MCU up and running. The suggested order of
operation is as follows:
Preparing for Installation
1.
2.
Unpack and Verify the Equipment
3.
4.
5.
Setting Up the MCU Component
6.
Assign an IP Address to the MCU
7.
8.
9.
Setting Up the MVP
Component
10.
Assign an IP Address to the MVP
11.
Change the Configuration Software Password
12.
Point the MVP to the Controlling MCU
13.