2
R1KR 28 - RAD - ING - Manual - 1807.1_SK.2_MIAB3013_R7_PDX
R1
K
R
2
8
_
E
N
SUMMARY
INTRODUCTION
4
1. INSTALLER SECTION
7
1.1. INSTALLATION
8
1.1.1. GENERAL INSTALLATION WARNINGS
8
1.1.2. BOILER LOCATION ENVIRONMENTAL REQUIREMENTS
8
1.1.3. REFERENCE LEGISLATION
9
1.1.4. UNPACKING
10
1.1.5. OVERALL DIMENSIONS
11
1.1.6. JIG
11
1.1.7. POSITIONING AND MINIMAL TECHNICAL SPACES
12
1.1.8. CIRCULATOR PREVALENCE/FLOW DIAGRAM
14
1.1.9. HYDRAULIC CONNECTION
15
1.1.10. SYSTEM FILLING
16
1.1.11. FILLING THE CONDENSATE COLLECTION SIPHON
17
1.1.12. ANTI-FREEZE PROTECTION
18
1.1.13. GAS CONNECTION
19
1.1.14. OPTIONAL ELECTRICAL CONNECTIONS
20
1.1.15. FUME EXHAUST FITTINGS
21
1.1.16. INSTALLATION MODES
22
1.1.17. TYPES OF FUME EXHAUST SYSTEMS
24
2. SUPPORT CENTRE SECTION
27
2.1. FIRST START-UP
28
2.1.1. PRELIMINARY OPERATIONS FOR FIRST START-UP
28
2.1.2. BOILER COMMISSIONING
29
2.1.3. CO2 VALUE CHECK AND CALIBRATION
30
2.1.4. ACCESSING AND PROGRAMMING THE PARAMETERS
31
2.1.5. MIAB3013 PARAMETERS TABLE
34
2.1.6. ELECTRIC FAN FREQUENCY/HEAT CAPACITY DIAGRAM
40
2.2. MAINTENANCE
41
2.2.7. GENERAL MAINTENANCE WARNINGS
41
2.2.8. TECHNICAL DATA
43
2.2.9. TECHNICAL ASSEMBLY
47
2.2.10. HYDRAULIC BOARD
48
2.2.11. WIRING DIAGRAM
49
2.2.12. ACCESSING THE BOILER
50
2.2.13. ACCESSING THE ELECTRONIC BOARD
51
2.2.14. SYSTEM EMPTYING
52
SUMMARY