The cables should be inserted inside the boiler
using the cable glands ‘P1’ and ‘P2’ placed under
the board (see fig. 1). Make a hole on the cable
gland, smaller than the cable diameter, to make
sure that the air cannot pass through.
To wire the optionals below:
• (SE) EXTERNAL TEMPERATURE PROBE COD.
73518LA
• (TA) ENVIRONMENT THERMOSTAT
• (CR) REMOTE CONTROL OPEN THERM COD. 40-
00017
use the electronic board placed inside the control
panel as follows:
DANGER
Cut off the voltage from the main switch.
› remove the boiler’s front casing (refer to chapter
ACCESSING THE BOILER);
› remove the crankcase of the control panel
(see chapter ACCESSING THE ELECTRONIC
BOARD).
· For the external temperature Probe connect
the two non-polarized conductors to the
contacts of the terminal M0904 (see ‘SE’ fig.
2).
· For the environment Thermostat or Remote
control, first remove the bridge on the
contacts of the terminal M0904 and then
connect the two non-polarized conductors
of the environment Thermostat or Remote
control (see ‘TA’ or ‘CR’ fig. 2).
After performing these operations, remount the
crankcase and the front casing.