10
R1KR 28 - RAD - ING - Manual - 1807.1_SK.2_MIAB3013_R7_PDX
1 Disimb
allo
_
m
ur
ale
_
EN
1. INSTALLATION
INST
ALLER
1.1.4. UNPACKING
WARNING
Please unpack the boiler just before
installing it. The Company is not responsible for
the damages caused to the device due to incorrect
storage.
WARNING
The packing elements (cardboard box,
wooden crate, nails, fasteners, plastic bags, expanded
polystyrene, etc.) must be kept out of the reach of
children as they may be dangerous. Therefore they
should be dismantled suitably differentiating them in
accordance with the standards in force.
To unpack the boiler, proceed as follows:
› Place the packed boiler on the floor (fig. 1-A)
and remove the fasteners opening the four flaps
of the box outwards.
› Turn the boiler at 90° holding it with your hand
(fig. 1-B).
› Lift the box (fig. 1-C) and remove the guards (fig.
1-D).
C
B
D
A
fig. 1