background image

QUIEDAN COMPANY

Instructions

1. Cut out an opening 4" in from the 11 12' tubes and header.

Overview:

Cutting out your front and back doors.

11     12' tube

Summary of Contents for 0048-2000-90-0221

Page 1: ...QUIEDAN COMPANY 22 x48 2000 Series Installation Manual...

Page 2: ...22 x48 2000 Series Components List QUIEDAN COMPANY...

Page 3: ...g according to the condition of the soil where the structure will stand Overview Setting up the foundation is crucial to maximizing the stability of your cold frame Be sure to clear out the portion of...

Page 4: ...MPANY Instructions 1 Use pneumatic pounder to install 13 platforms 2 6 in the ground at insertion points 2 Be sure that the top of the platforms are leveled Overview Inserting platform posts 13 platfo...

Page 5: ...third and fourth 13 platform posts of each corner see picture below 2 Set 25 uni directional tops on the heads of 13 platforms and align appropriately Overview Preparing platform posts by attaching un...

Page 6: ...e bolt strap clamps connect six foot 33mm tubes and 9 eight foot 33mm tubes as shown below to reinforce corners Overview Connecting platform posts at all four corners to create support bracing 8 6 tub...

Page 7: ...to create arc drill in two 1 screws at the unions to hold tubes together 3 With one person on each side insert one end at a time and continue until all arc sets are installed onto 13 platforms Overvi...

Page 8: ...t 10 10 tubes from the end arcs to the appropriate platform posts as shown below Overview Attachment of the stretchers will provide additional support to both ends of the cold frame since this is wher...

Page 9: ...ns to hold tubes in place to create one purlin Construct four purlins two interior and two exterior and connect them to arcs using 22 33 33mm hinged double clamps See sketch below Overview Setting up...

Page 10: ...Y Instructions 1 Drill 28 aluminum channel along the top side of the first and last arcs as well as on the exterior purlins as shown Overview Attaching aluminum channel to first and last arcs 28 alumi...

Page 11: ...2 10 swaged tubes drill in two 1 screws at the unions to hold tubes together and connect all appropriate pieces for 3 crank handle including 14 33mm swaged insert connectors if necessary Once film is...

Page 12: ...s 4 Cut both 11 12 tubes approximately 1 2 below the hoop Attach the top of the the 12 tubes to the hoop using the 18 oblique clamps 5 Using 16 33 33mm straight clamps clamp the other ends of 8 6 tube...

Page 13: ...lock film inside 28 aluminum channel 3 Wrap up the bottom excess film to the roll up arms assembled in a previous step page 11 4 Do this for both sides Overview Attaching film to create roll up sidewa...

Page 14: ...he front very tight and lock film into the front hoop s 28 aluminum channel film must be put on tightly to prevent flapping which can cause potential tearing 4 Trim excess film that hangs over the fro...

Page 15: ...is 32 wide by x 2 long i e if the cold frame height is 13 your sheet should be 32 x15 3 Center the sheet and lock film into 28 aluminum channels with 12 of film going upwards past the top and 12 downw...

Page 16: ...QUIEDAN COMPANY Instructions 1 Cut out an opening 4 in from the 11 12 tubes and header Overview Cutting out your front and back doors 11 12 tube...

Page 17: ...top portion of the film to the 23 aluminum channel with 27 wiggle wire approximately 6 above the header 3 Wrap up the excess bottom portion of the sheet to the 11 12 tube using 15 4 abs cuffs For cran...

Page 18: ...ed insert connectors are in place drill in SDS screws through both sides to secure them in place 4 For Side Roll Up Assembly insert the swaged connector end into the 8 8 tube roll up assembly tube Dri...

Reviews: