QUIEDAN COMPANY
Overview:
Assembling side roll-up tube (a total of two).
1 sds screws
3 crank handle (2)
10 10' tubing (2)
12 10' swaged tube (10)
14 33mm swaged insert connector (4)
15 4" abs cuff (134)
Instructions
1. Connect five 12 10' swaged tubes (drill in two 1 screws at the
unions to hold tubes together) and connect all appropriate
pieces for 3 crank handle (including 14 33mm swaged insert
connectors if necessary). Once film is ready to be attached
to side roll-up tube, clamp on one 15 4" abs cuff at every foot
as shown (repeat this to create a second roll up for opposite
side of structure).
2. See page 18 for Large Crank Handle assembly details.