QUIEDAN COMPANY
Overview:
Creating your front and back roll up doors.
Step 1
Step 2
Step 1 of
poly web attachment
Step 2 of poly web
attachment
4 2" poly web strap
11 12' tube (2)
13 platform post
15 ABS cuff (16)
26 end "J" SDS strap clamp 42mm (18)
27 wiggle wire (18)
28 aluminum channel
Instructions
1. From the remaining film, cut out a 11'x12' sheet.
2. Lock the top portion of the film to the 23 aluminum channel with
27 wiggle wire approximately 6" above the header.
3. Wrap up the excess bottom portion of the sheet to the 11 12' tube using
15 4" abs cuffs. (For crank handle assembly, see page 18).
4. Screw on 26 42mm end "J" SDS clamp to the outside of each 13
platform, a few inches above ground with 4 poly web strip between the
26 "J" SDS clamp and the 13 platform (see illustration below, step 1).
5. Using the same strip of 4 poly web, screw the other end of the
strip into 28 aluminum channel. (see illustration below, step 2).