18
1.
Large Crank Handle,
remove nuts and bolts
from the universal joint
areas. Remove handle
and set aside.
2.
Insert 11 swaged
connector into the
universal joint ends.
Crank Handle Assembly
3.
Once 11 swaged insert
connectors are in
place, drill in SDS
screws through both
sides to secure them in
place.
4.
For Side Roll-Up
Assembly insert the
swaged connector end
into the 8 8
’
tube roll
up assembly tube. Drill
SDS screws to connect.
5.
For the Front/Back roll-
up door assembly,
insert swaged
connector end into the
9 12
’
roll-up door
assembly.
4 Large Crank Handle (2)
8 8
’
Tubing (2)
9 12
’
Tube
11 Swaged connector (4)