Locate two 3x5x5 spacers, two flybar control
arm bases, two flybar control arm extensions,
and two M4x4 set screws. Slide (2) 3x5x5
spacers onto the flybar with the protruding
side going against the seesaw. Next slide the
flybar control arm bases onto the flybar.
They face in opposite directions and oppose
the M3x6 pivot studs on the seesaw
previously installed. Secure them with (2)
M3x5 set screws. Be sure that they are
parallel with each other and that the flybar is
equally distant from both ends.
You may find it easier to assemble the flybar
assembly before mounting the head.
Attach the (2) flybar control arm extensions
using (2) M3x8 cap head screws.
This needs to happen before the flybar
control arms are installed on to the flybar.
Note the side that the flybar control arm is
facing.
Screw each paddle onto the flybar 25mm. Be
sure the paddles are parallel with each other.
Also the paddles should be inline/parallel
with the flybar control arms.
Use M3x24 cap head bolts with M3 locknuts
to attach each blade to the grip.
21