![Quick MILL MILANO 0980 Operating Instructions Manual Download Page 57](http://html1.mh-extra.com/html/quick-mill/milano-0980/milano-0980_operating-instructions-manual_3685569057.webp)
57
Ita
lia
no
En
gli
sh
Fr
an
ça
is
D
eu
tsc
h
In machines with
display, during delivery it is possible to see
the seconds count to check the extraction time.
It is recommended to be very careful of the machine hot parts, especially the
delivery group and the steam pipe. Never place the hands under the steam pipe
and/or the group when carrying out the relevant operations.
Steam delivery
1. Activate the steam delivery for a few seconds with the knob (
d
) and
discharge the condensation formed in the steam pipe into the drip tray (
l
)
then close the steam delivery.
2. Immerse about half the steam wand (
e
) in the brew to be heated, start the
steam delivery again with the knob. When the required temperature is
reached, close the knob.
It is advised, after heating the beverage, to always discharge a
little steam from the wand to clean the spray holes.
Hot water delivery
1. Place a container to collect the water under the hot water distributor, then
open the tap (
f
) and close it when the required water level is reached.
Standby/Economy function
The Standby/Economy is used to set the machine in a condition of low
conpumption by switching off the boiler heating resistor.
The machine automatically sets in Standby/Economy after 20 minutes if no
coffee is delivered.
When the machine is in Standby/Economy, the relevant LED (
s
) flashes every 2
seconds.
To exit from Standby/Economy, just deliver a coffee with the lever.
Summary of Contents for MILANO 0980
Page 32: ...32 Ita lia no En gli sh Fr an a is D eu tsc h 0985 AQUILA E AQUILA PID...
Page 44: ...44 Ita lia no En gli sh Fr an a is D eu tsc h 0992 QM67 2 BOILER PID...
Page 54: ...54 Ita lia no En gli sh Fr an a is D eu tsc h 0995 VETRANO 2 BOILER PID...
Page 61: ...61 Ita lia no En gli sh Fr an a is D eu tsc h 995 VETRANO DOSATA 2 BOILER PID...