![Quick MILL MILANO 0980 Operating Instructions Manual Download Page 31](http://html1.mh-extra.com/html/quick-mill/milano-0980/milano-0980_operating-instructions-manual_3685569031.webp)
31
Ita
lia
no
En
gli
sh
Fr
an
ça
is
D
eu
tsc
h
Steam delivery
1. Wait until the heating light
switches off (
l
) and make sure that the
pressure indicated on the boiler gauge is over 0.8 Bar.
2. Open the steam valve (
d
) for a few seconds and discharge a little steam
into the drip tray (
i
) then immerse the steam wand (
e
) in the liquid to be
heated and open the tap, when the required temperature is reached, close
the tap.
After heating the beverage, always discharge a little steam from
the wand to clean the spray holes.
For this model, without adjustment PID, the machine temperature
management is by means of a specific pressure switch.
Hot water delivery
1. Place the container to collect the water under the hot water wand (
g
).
2. Open the water tap (
f
) to deliver the hot water.
3. When the required level is reached close the water tap.
Summary of Contents for MILANO 0980
Page 32: ...32 Ita lia no En gli sh Fr an a is D eu tsc h 0985 AQUILA E AQUILA PID...
Page 44: ...44 Ita lia no En gli sh Fr an a is D eu tsc h 0992 QM67 2 BOILER PID...
Page 54: ...54 Ita lia no En gli sh Fr an a is D eu tsc h 0995 VETRANO 2 BOILER PID...
Page 61: ...61 Ita lia no En gli sh Fr an a is D eu tsc h 995 VETRANO DOSATA 2 BOILER PID...